My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-28_PERMIT FILE - M2006085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2006085
>
2006-12-28_PERMIT FILE - M2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 10:35:21 AM
Creation date
11/26/2007 2:14:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006085
IBM Index Class Name
Permit File
Doc Date
12/28/2006
Doc Name
112c application
From
Leone Sand and Gravel, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cototado Deparbnent of Public Health and EnWronrrtent <br />11)r Poiiittlorf Colriro111Mfalon <br />• Surface mining equipment almost always requires <br />an air pertniL <br />When a permit ffi requaed, the ADEN wilt become part ~ <br />the pemtit applicaton package. <br />- The Permit Process: <br />In Coorado, Catstrudion Permits are issued in two <br />phases: Initi~ Approval and Final Approval. <br />An Initial Approval (IA) Permit aibws the plant or <br />process egtipment to be conswetad and begin <br />operation. Wtren an atr permit ffi required. N is illegal <br />to canmer~e operation of the pfmtt w process <br />equipment tattN an 1A Perrnk ffi issued by the APCD. <br />Some ex for austt~s and sateens are <br />provided under muse t~ 1328. <br />• A Fktat Approval (FA) permk ffi issued attar the <br />owrt~ atrtVfiea that the permitted operation ffi in <br />compliance witlt the oorMitkrrts ~ the Initial Approval <br />Permk. <br />A penny descn'bes key areas Drat an operator needs to <br />oddness to comply with Coktra~ atr regulations. The <br />pemty defines the type of a'a poyutbrt oattrd measrues <br />to ~ used. lirnya Ste annual production at the site. <br />provides gutdaitnes for opodly (how dense the vffiible <br />emffieiorre are allowed to be), and htcdrdea <br />recordkeeping retluiraments. <br />Obtaining a Flea/ Apprvvai Perrrtlt <br />to order to receive a F~ Approval Penult for your <br />surface miMrp efts or equipment, you must cerUty <br />came with you In3tiet Approval Permit. This self- <br />oartiflcetbn process must be cartpletad wyhin 180 days <br />(sbc months) of Hektg iswed an Mitiaf Approval Penny. <br />Aim f80 days. the APCD must firtattze 6te permit or <br />determirre !o continue err revoke Ore permit. <br />Certifying complrenoe with tits IA penny for a surface <br />mining eye typkreyy Mvohres submitiatg a Final Approval <br />sett Cyst Fasn. This form ffi evadable through <br />the APCD end downtoadabb at: <br />www.odatte.stafe.co.trsta Wdownbadfonns.aso <br />Certifying Compirenoa with the U4 permit for process <br />equipment typiGef{tr involves submigMg a Ferel Approval <br />SelF Certificatlon Form and tire required opadty East <br />resutffi (ie., either a B-malute opacHy readhtg a a 1-3 <br />hour opacity reading maybe required depa„aing on the <br />type and design rate of the equipmerd). The APCD can <br />assist you in determuting the opacity readings required <br />for your equipment. <br />ify(~~W <br />House Bf// 1328 - Rexibtlfty fns Crtrsh~s <br />and Screens <br />Owners or operators ~ auface minng operetiarts are <br />lypiCapy required to obtain an IA permh fa process <br />equipment prior to operating the equi{unenf at the efts. <br />tiovwsver, Colorado house Bfll 1326 provides some <br />tte7~4y for reporting artd penntit6tg crushers artd <br />speens. tinder House t3i111328, the owner or operator <br />~ a permuted sand and grave! pit or crushed stone <br />quarry may bring a now usher or scream (~ the <br />engines ttret are integral b tftose crushers and scxeens) <br />ortsi6e and f>egin operetion of tins equipment by <br />submilthrg an ADEN to Uie APCD. Submffieiort ~ an <br />APEN wdi apow the so~oe to operate the equ>prrtertt <br />tattil strch time es the APCD ffi able to process and issue <br />~ IA Permit, or for temporary or renffid equipment, tud9 <br />th equipment ffi removed Iran the sNe. You must natiry <br />the APCD (by adding s Hate to th APFJJ forth) that you <br />are submitting an ADEN under fire provistare of House <br />8f91326. &r Cases whets you intend to retaffi ownersh~ <br />of the equipment for 8re faesa~le toffee, you must <br />request in wrtigtg tltaf the APCD proceed witit the <br />pertnitl6tg process, incases where yar inUmd ro return <br />tmnporary or rented equipment withkr a few months. you <br />c:at atnoM unnecessary permiying teas by requesting <br />that the APCD ?wtd' the APEN luttA you remove the <br />equipment and submit a ration ffi tits APCD. <br />App/lcab/e Fees <br />APETI Ffyrrg Fee: A tHing f~ of 6119.98 ka requbed to <br />Cre submiyed wyh each ADEN. <br />Annual E.errisNon Feas: Ati sauces requhe0 to file <br />APENs rtwat pay annual air emisslat fees. The APCD <br />(tHffi each souroe titat is su~eCt to an APEN an annual <br />fee of E13.54 per ton of criteria polk~rtffi sniffed and <br />180.34 ~- tat of rtoncrttaia (harnrdous air polkrfartffi) <br />emyffid. Fees are not assessed for ttrgyive dust <br />missions. Urvt eve mailed in Marta through June of <br />each year. Fees are subject to dlange by fire <br />le9istature on an annual basis. <br />Perrrtk6ng Fees: The APCD assesses a petrnittirtg fee <br />based on the arttount of time it takes tits APCD fo <br />process tire application. iris current processing tae ffi <br />559.98 per hau. These tees are also subject to change. <br />QU@S+f/OAS~ <br />The Small Busk>ass Assistance Program (SttAP) ffi <br />avadatNa ro assist you with questions you may have <br />regardi~ envBonmentaf issues at your site. Contact <br />the SBAP at (303) 692-3175 or (303)692-3148. <br />Air Quality Requirements for Surface Mkting Operations May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.