Laserfiche WebLink
Room and Pillaz Mining Method ....................................... ....... 2.05-7 <br /> Longwall Mining Methods ................................................ ....... 2.05-9 <br /> Mining Under Restricted Areas ......................................... ....... 2.05-9 <br /> Health and Safety ............................................................................... ....... 2.05-9 <br /> General Mine Safety .......................................................... ....... 2.05-9 <br /> Explosives and Blasting .................................................... ....... 2.05-9 <br /> Fire Prevention .................................................................. ..... 2.05-10 <br /> Ventilation ......................................................................... ..... 2.05-10 <br /> Electrical Power ................................................................ ..... 2.05-11 <br /> Accidents ........................................................................... ..... 2.05-11 <br /> 2.05.3 Operation Plan -Permit Area ............................................................ ..... 2.05-15 <br /> (1) Production Methods and Equipment ............................................ ..... 2.05-15 <br /> (2) Operation Description .................................................................. ..... 2.05-15 <br /> F-Seam ............................................................................... ..... 2.05 -15 <br /> E-Seam .............................................................................. ..... 2.05-15 <br /> B-Seam .............................................................................. ..... 2.05-15 <br /> Manpower Requirements .................................................. ..... 2.05-15 <br /> (3) Mine Facilities .............................................................................. ..... 2.05-15 <br /> General Construction Procedures ...................................... .....2.05-16 <br /> Major Building and Structures .......................................... ..... 2.05-17 <br /> Haul/Access Roads ............................................................ .....2.05-22 <br /> Light-Use Roads ................................................................ ..... 2.05-23 <br /> Department of Highway Approvals .................................. ..... 2.05-24 <br />• Landslide Corrective Measures ......................................... ..... 2.05-25 <br /> (4) Ponds, Impoundments, and Diversions ........................................ .....2.05-25 <br /> Hydrologic Design of Runoff Ponds ................................. .....2.05-26 <br /> Miscellaneous Sediment Control Facilities ....................... ..... 2.05-27 <br /> General Requirements for Sedimentation <br /> Control Facilities ............................................................... .....2.05-28 <br /> Sedimentation Pond Operation .......................................... ..... 2.05-28 <br /> Spillway Designs ............................................................... ..... 2.05-31 <br /> Stability Program Description ........................................... ..... 2.05-31 <br /> Hydrologic Protection During Construction ..................... ..... 2.05-32 <br /> Hydrologic Protection During Operation .......................... ..... 2.05-34 <br /> Impacts of Overtopping Hydrologic Structures ................ ..... 2.05-34 <br /> Collection and Diversion Channels ................................... ..... 2.05-35 <br /> Small Area Exemptions ..................................................... ..... 2.05-36 <br /> Fresh Water Ponds ............................................................. ..... 2.05-36 <br /> (5) Topsoil .................................................................................. .....2.05-36 <br /> (6) Overburden ........................................................................... .....2.05-37 <br /> (7) Coal Handling Structures ..................................................... ..... 2.05-37 <br /> (8) Coal Processing Waste and Non-Coal Processing Waste .... .....2.05-39 <br /> (9) Return of Coal Mine Waste to Abandoned Workings ......... .....2.05-40 <br /> (10) Return of Coal Processing Waste to Abandoned Workings. ..... 2.05-40 <br /> (11) Return of Coal Processing Waste to Abandoned Workings. ..... 2.05-41 <br />• 2.05.4 Reclamation Plan ............................................................................... .....2.05-50 <br />V I Revised November 1004 PRI G <br />