Laserfiche WebLink
West Elk Mine <br />• <br /> <br />C~ <br />Tables (Continued) <br />Table 31 Typical Equipment Used in Longwall Mining at the West Elk Mine ............2.05-6 <br />Table 32 Projected Employment Needs at the West Elk Mine for the <br /> Current Permit Term ..................................................................... ..........2.05-16 <br />Table 33 Summary of Mountain Coal Company's Water Rights <br /> For the West Elk Mine .................................................................. ..........2.05-19 <br />Table 36 Approximate Topsoil Stockpile Volumes for West Elk Mine Site .... ..........2.05-52 <br />Table 37 Permanent Seeding Mix ...................................................................... ..........2.05-53 <br />Table 38 Shrub Planting Species List ................................................................. .........2.05-53 <br />Table 39 Temporary Stabilization Seed Mix ...................................................... .........2.05-54 <br />Table 40 Species Identified in Riparian Areas at the West Elk Mine ................. ......... 2.05-66 <br />Table 41 Rangeland Reclamation Success Criteria ............................................ ......... 2.05-67 <br />Table 41A Timetable for Major Reclamation Tasks ............................................. ......... 2.05-83 <br />Table 42 Definition of Subsidence Terms .......................................................... .........2.05-94 <br />Table 43 Intentionally Left Blank ....................................................................... .......2.05-167 <br />Table 44 Sylvester Gulch Water Rights .............................................................. .......2.05-177 <br />Table 45 Mountain Coal Company's North Fork Water Rights ......................... .......2.05-180 <br />Table 47 Estimated Percent Change in North Fork Flow Volumes .................... .......2.05-184 <br />Table 48 Estimated Percent Change in North Fork Stream Flows <br /> Under Extreme Low Flow Conditions ........................................... .......2.05-186 <br />Table 49 Actual and Projected Water Usage ...................................................... .......2.05-186 <br />Table 50 Summary of Discharge Water Quality From Sediment <br /> Pond MB-2R .................................................................................. .......2.05-191 <br />Table 51 NPDES Effluent Limits for Discharge From Sedimentation <br /> Ponds at the West Elk Mine ........................................................... .......2.05-191 <br />Table 52 Summary of F-Seam Mine Discharge Water Quality Data ................. .......2.05-193 <br />Table 53 Summary of Baseline Groundwater Quality for Wells <br /> and Inflows Located in the B-Seam ............................................... .......2.05-194 <br />Table 54 1996 Impacts of MCC Dischazges on the North Fork ......................... .......2.05-197 <br />Table 55 Representative TDS Standards/Criteria ............................................... .......2.05-199 <br />Table 56 SAR Values at Various Locations ....................................................... .......2.05-200 <br />Table 57 TDS Concentrations and Loads Relative to 1992 CHIA Analysis ...... .......2.05-201 <br />Table 58 Eliminated ............................................................................................ ..................... <br />Table 59 Effects of Wastewater Treatment Plant Dischazge on the North Fork .......2.05-203 <br />Table 60 Wastewater Discharge Impacts on North Fork Gunnison River <br /> During Low Flow Conditions ....................................................... ........2.05-203 <br />Table 61 Intentionally Left Blank ........................................................................ ...................... <br />Table 62 Summary of Estimated Probable and Worst Case Groundwater <br /> Inflow to the Mine (1994 Estimate) ............................................... .......2.05-220 <br />Table 63 Summary of Estimated Probable and Worst Case Groundwater <br /> Inflow to the Mine (1997 Estimate) .............................................. ........2.05-221 <br />Table 64 Average Acid-Base Potential for Overburden Samples ...................... ........2.05-253 <br />Table 65 Surface Areas of Alluvial Deposits Neaz the West Elk Mine ............. ............2.06-4 <br />xi <br />Revised November 1004 PR70 <br />