My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134372
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Western Portal Re-Opening & Roof Control Plan
Section_Exhibit Name
APPENDIX XXII And Appendix XXIII
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{~ripenai,ulc AflP X Y - I - I <br />~^ <br />+. ~ rj TOTE QF COLOR6OCD 9q IN.9~) D ta44 ri nv...... <br />DEPARTMENT OF NATURAL RESOURCES <br />'Man ~S D $ner man. E+e cu(~ve D~reuoi <br /> <br />~~ ~ A1L'~Ell L_A\D RECL..a11:1"I'10\ <br />,~ <br />.~ ~ 4?3 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (3031 8393567 <br />Hamlet J. Barry, II I, <br />Director <br />Western Slope Carbon <br />Our File 1/78-155 <br />STIPULATIONS <br />FOR <br />WESTERN PORTAL RE-OPENING <br />• <br />1, The parking lot area be regraded so that any runoff that would <br />have accumulated on the top of the fill will be diverfed back towards <br />the road. A detailed regrading plan is to be submitted to that <br />effect. <br />2. The fill must be certified by a registered engineer regarding the <br />stability fo the fill. <br />3. A retaining wall is to be built in the portal area to decrease the <br />slope and thereby stabilize the area against landslides. <br />4. In regard to the sediment control system, <br />a) A statement that the sediment pond will be certified <br />by a registered, profession engineer shall be submitted. <br />b) Sizing for the collection ditches to the pond should <br />be submitted, <br />c) Elevation for the principle spillway must be provided. <br />S. The map displaying the new features of the TR be submitted immediately, <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.