Laserfiche WebLink
HOURLY PRODUCTION <br />• Hauling Caoacitv <br />Scraper Payload (weight) Basis <br />Material weight : 2, 075 pounds/LCY <br />Material description <br />USER-PROVIDED WEIGHT DATA <br />Rated payload : 75,000 pounds <br />Payload capacity : 36.14 LCY <br />i • <br />Travel time <br />Road condition tlescription :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul Route <br />xraper Bowl (volume) Basis <br />sheet 2 of 2 <br />b.• <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY '*' <br />txwry production reflects volume per scraper pair on pushpull models <br />Cvcle Time : ob Condition Corrections : Site aRitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time " : 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job effidency : 0.830 NA (Cat HB) <br />• toad time per scraper pair on push-pun models Net ('AReCtIOn : 0.830 NA <br />Seg. # Haul distance (feet) Grade (%) Roll. res, (%) Total res. (~°) ~ Velodty (fpm) Travel time (min.)"" <br />1 1,000 0.00 5.00 5.00 1867 0.65 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.65 minutes <br />Return route <br />•• travel time ror each segment is adjusted for acceleratior/deceleration. ~ Return time : 0.55 minutes <br />table veloctties are max. attainable per total resistance shown, not average - <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.80 minutes <br />Unadjusted unit production/hour : 1,114.48 LCY/hour "' Adjusted for job condRions : 925.02 LCYmour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper{s) <br />Adjusted single scraper team (unit) hourly production : 925.02 LCY/hour <br />Adjusted multiple scraper team (fleet) houdy production : 925.02 LCY/hour <br />• JOB TIME AND COST <br />Fleet size : 1 Teams} <br />Unit cost : $0.595 /LCY <br />Totaljobtime: 2,3oS9.01 Hours <br />Total job cost : $1,298,407 <br /> <br />