Laserfiche WebLink
• Task 110 SLB Addendum to Seneca II Reclamation Cost Estimate <br />C-1980-005 12/6/2005 Reclaim Stock Tanks 15 and 25 <br />No as built certifications were generated for iwo now reGaimed stock tanks. <br />Assume $5000.00 per stock tank (SCC estimate). <br /># Ponds 2 <br />Cost per Pond $5,000.00 <br />Total $10,000.00 ' <br /> <br />• <br />/3-/-/~~ <br />