My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134366
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
Tab 13 Attachment 13-1 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />~,li . ril: . <br />PROJECT IDENTIFICATION <br />Task # : 107 <br />Date : 12/01/2005 <br />User: SLB <br />Agency or organization name : CDMG <br />Permit or other job action :Technical Revision 37 <br />Task description : Regrade Stock Tank 2 <br />ii ~i C~ t~.~i'~~~r,ji ":i~ ~ i•+~1~~ i i~.,~j'~ r :~I',I Pl~i~~~i~ii ~:. ; <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />State :Colorado <br />County:Routt <br />Site :Seneca li Mine <br />Basic machine : Cat Dl l R - 11 SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Ufilization <br />Ownership cost/hour : $111.01 ~ NA <br />Operatingcost/hour: $188.40 100 <br />Ripper op. cosfRwur : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $331.19 Total fleet cost/hour <br /> <br />• MATERIAL QUANTITIES <br />Initial <br />volume : 531 BCY <br />Swell Loose <br />factor : 1.250 volume : 664 <br />$331.19 <br />LCY <br />Source of estimated volume :70' I x 8.2' h, top width 15; bottom width 35' <br />Source of estimated swell factor :Consistent with other SCC tasks <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 I (av . <br />9) <br />Average push distance : 50 feet Material consistency : 0.70 (user) <br />Unadjusted hourly production : 4,351.4 LCY/hr Dozing method : 0.50 (user) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />User provided factor Spoil pile : _ 0.40 (user) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Attitude : 1.00 (Cat HB) <br />Average site attitude : 6,985 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 IbslLCY Net correction : 0.08 <br />Weight description <br />Earth -Dry packed <br />• JOB TIME AND COS7 <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.969 /LCY <br />Adjusted unit production : 341.92 LCYIhr <br />Adjusted fleet production : 341.92 LCYMr <br />Permifrob# : C-1981-005 <br />Abbreviation :none <br />Filename :0005-107 <br />Total job time : 1.94 Hours <br />Total job cost : $643 <br />r <br />Horsepower: 850 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.