My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134366
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
Tab 13 Attachment 13-1 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 094 <br />Date : 12/01/2005 <br />User: SLB <br />Agency or organization name : CDMG <br />Permit or other job action :Technical Revision 37 <br />Task description : Regrade Stock Tank 7 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />• MATERIAL QUANTITIES <br />Initial <br />volume: 1,062 BCY <br />State :Colorado <br />County:Routt <br />Site :Seneca li Mine <br />Perm~ob# : C-1981-005 <br />Abbreviation :none <br />Filename :0005-094 <br />Basic machine :Cat Di 1R - f iSU <br />Blade type:Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> llfllization <br />Ownership cosUhour : $111.01 NA <br />Operating cosffiour : $188.40 100 <br />Ripper op.casOhour: $0.00 0 <br />Operator cosUhour: $31.78 NA <br />Total unit cosUhour : $331.19 Total fleet cost/hour <br /> <br />$331.19 <br />Swell Loose <br />factor : 1.250 volume : 1,328 LCY <br />Source of estimated volume :130' 1 x 7' h, top width 18', bottom width 45' <br />Source of estimated swell fador :Consistent with other SCC tasks <br />I ~ ~~ ~ :' <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.70 (user) <br />Unadjusted howdy production : 4,351.4 LCY/hr Dozing method : 0.50 (user) <br /> Ysibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (ishitt/day) <br />User provided factor Spoil pile : 0.40 (user) <br /> Push gradient . <br />~ 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,340 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.08 <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COS7 <br />Fleet size : 1 Dozers) <br />Unit cost : $0.969 /LCY <br />4i ~ ~ <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />Horsepower: 850 <br />Shift basis : 1 per day <br />341.92 LCY/hr <br />341.92 LCY/hr <br />3.88 Hours <br />$1,288 •. <br />Data source : (CRG) <br />/3-/-l3? <br />
The URL can be used to link to this page
Your browser does not support the video tag.