Laserfiche WebLink
• Task 087 SLB Addendum to Seneca II Reclamation Cost Estimate <br />C-1980-005 1218!2005 Site Maintenance <br />Rill and Gully repair/road maintenance over liability period. <br />Based on SCC estimate. <br />Assume 40 hrs per year, plus 4 hrs mob/demob from Hayden, ten year liability period. <br />Caterpillar 14H <br />Mob/Demob 40.00 $109.27 $4,370.80 <br />Grading 400.00 $109.27 $43,708.00 <br />Total <br />$48,078.80 - <br />1 <br />• <br />n <br />~J <br />/3-/-/3i <br />