Laserfiche WebLink
<br />~OADABLE EQUIPMENT <br />Machine <br />Description Total <br />CosUhourlunit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Retum Trip <br />CosUhrHleet <br />-REEDRILL SKSAD, 7.0 in. $142.78 1 $142.78 $142.78 <br />-Fuel Tanker, 6x4, 210 HP $54.00 1 $54.00 $54.00 <br />-Cube Truck, 6x4, 210 HP $68.05 1 $68.05 $68.05 <br />-GENERIC 3.9 in. - 3,100 R. capy. $60.38 1 $60.38 $60.38 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals :, $325.21 ! $325.21 <br />;~~ ~Ii liiib~F'~Y.yial•~ad~~i xl it%',i i'i.~ r..F~.sM^:~.4 'a <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within projed area region <br />Trans ortation C cle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />r1 <br />~J <br />4.00 ~ 4.00 Total non-roadable mob/demob cost' <br />4.00 4.00 'two round trips with haul rig <br />4.00 I NA Total roadable mob/demob cost *` <br />4.00 NA ^ one mood trip. no haul d9 <br />16.00 ~ 8.00 <br />1-',viV ~~''.:. <br />sheet 2 oft <br />~'~¢ <br />Denver <br />180.0 miles <br />45.0 mph <br />$109,571.56 <br />$2,601.67 <br />Total job time : 32.00 hours <br />Total job cost : $112,173 = <br />/3-I-I23 <br />