Laserfiche WebLink
• Task 83 SLB Addendum to Seneca II Reclamation Cost Estimate <br /> C-1980-005 121212005 Stabilize Oreinage Channels <br /> Rip rap Cu.Yds. $/Yd. Total Cost <br /> PM-1, Upper 3079 $57.70 1 $177,658.30 <br /> PM-4, Upper 1444.4 $57.70 $83,341.88 <br /> PMT, Mid 1389.26 $57.70 $80,160.30 <br /> PM-4, Lower 440.89 $57.70 $25,439.35 <br /> PM-5 141.16 $57.70 $8,144.93 <br /> PM-6, Upper 560 $57.70 $32,312.00 <br /> PM-6, Mid-Upper 1199.66 $57.70 $69,220.38 <br /> PM-6, Mid 289.33 $57.70 $16,694.34 <br /> PM-6, Mid-Lower 4876.67 $57.70 $281,383.86 <br /> PM-6, Lower 1410.38 $57.70 $81,378.93 <br /> PM-8a 335.111 $57.70 $19,335.90 <br /> PM-8b 208 $57.70 $12,001.60 <br /> PM-13 906.92 $57.70 $52,329.28 <br /> PM-16 223.533 $57.70 $12,897.85 <br /> PM-20 610.01 $57.70 $35,197.58 <br /> 17114.32 $57.70 $987,496.49 <br /> Gravel Cu.Yds. $/Yd. Total Cost <br />• PM-0a 58.27 $25.77 2 $1,501.62 <br /> PM-0b 428.21 $25.77 $11,034.97 <br /> PM-8 490.67 $25.77 $12,644.57 <br /> PM-11 96.2 $25.77 $2,479.07 <br /> PM-12, Upper 166.23 $25.77 $4,283.75 <br /> PM-12, Lower 340.18 $25.77 $8,766.44 <br /> PM-14 208.06 $25.77 $5,361.71 <br /> PM-15 247.08 $25.77 $6,367.25 <br /> PM-17 65.37 $25.77 $1,684.58 <br /> 2100.27 $25.77 $54,123.96 <br />Total Cost <br />1 -Means Site Work and Landscape Cost Data 2005 - 02370-0200 <br />2 -Means Site Work and Landscape Cost Data 2005 - 02060-0100 and -0900 <br />L <br />$1,041,620.45 <br />/3 - / -t2 / <br />