Laserfiche WebLink
I• <br />• <br />Task # : 080 <br />Date : 12/01/2005 <br />User: SLB <br />CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />~ ~ ~;, ; " is <br />State :Colorado <br />County : Routt <br />Site :Seneca Ii Mine <br />Agency or organization name : CDMG <br />Permit or other job action :Technical Revision 37 <br />Task description :Replace topsoi/ alo <br />HOURLY EQUIPMENT COST <br />access roads <br />Basic machine :Cat D8R Series ll - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilizafion <br />Cosf Breakdown : Ownership cosVhour : $42.78 ~ NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $31.78 NA <br />Total untt cost/hour : $140.66 Total fleet cosUhour : $140.66 <br />MATERIAL QUANTITIES ~ ~~ <br />Inrfial Swell Loose <br />volume : 43,560 CCY factor : 1.150 volume : 50,094 LCY <br />Source of estimated volume :SCC Task ACCESS-1 <br />Source of estimated swell factor : Consisten with other SCC tasks <br />,~'i ~,•I~I ~ I ~~ ~=,ilj I~~ .~ : ~~~ ~ ~'r-i(' ~ If;~ ~'~ i[ I;i 1!'d <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> ~ Operator skill : 0.75 ~ (avg.) <br />Average push distance : 100 feet ~ Material consistency : 0.95 I (user) <br />Unadjusted hourly production : 852.6 LCY/hr ~ Dozing method : 0.60 (user) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />User provided factor Spoil pile : 0.50 (user) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Attitude : 1.00 (Cat HB) <br />Average site attitude : 8,000 feet ~ Material weigh : 1.11 (user) <br /> Blade type : 1.00 (S/SUAI) <br />Material weight : 2,075 Ibs/LCY ~ Net correction : 0.20 <br />Weight description : ~ <br />USER-PROVIDED WEIGHT DATA ~ Adjusted unit production : 167.60 LCY/hr <br /> Adjusted fleet production : 167.60 LCY/hr <br />• c. <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 298.88 Hours <br />Unit cost : $0.839 /LCY Total job cost : $42,040 ~. <br /> !; .. ,ins <br /> l3 -! - ii8 <br />Perm~ob# : C-1981-005 <br />Abbreviation :none <br />Filename : 0005-080 <br />