My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134366
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
Tab 13 Attachment 13-1 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />• Hautfna Caaatety : e SS <br />Scraper Payload (weight) Basis : ~ Scraper Bowl (volume) Basis <br />Material weght : 2, 075 poundslLCY Struck volume : 21.00 LCY <br />Material description : Heaped volume : 31.00 LCY <br />USER-PROVIDED WEIGHT DATA Average volume : 26.00 LCY <br />Rated paybad : 75,000 pounds Adjusted ppaciiy : 26.00 LCY "' <br />Payload capacity : 36.14 LCY ~"' tuxvy protlucdon reflects vohaarie per scraper pair onpush-pull models <br /> <br />Cvcle Time : lob Condition Corrections : Site altitude (ftJ : 7,500 <br /> Scraper ~ Push dozer ~ Source <br />Scraper loading fine' : 1.00 minutes Attitude adj.. 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />'bad time per scraper pair an pustFpuq models Net Correction : 0.830 NA <br />J <br />Travel time <br />Road condit+on description :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul Route <br />Seg. # I Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) ~ Velodty (fpm) Travel time (min.)" <br />1 1,800 -8.30 5.00 -3.30 2972 0.68 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul time : 0.66 minutes <br />"travel time for each segment is adjusted for accete2donltleceleradon. Return time <br />table velocities are max. attainahle per ~I resistance shown, not average <br />Total scraper team cyGe time (load + haul + maneuver and spread + return) <br />Unadjusted unit productiotf/hour : 821.55 LCYfiour "` Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (trait) hourly production <br />Adjusted multiple scraper team (fleet) hourly productiorf <br />• JOB TIME AND COST <br />Fleet size : 2 Team(s) <br />Unft cost : $1.013 /LCY <br />Total job time <br />Total job cost <br />1.54 minutes <br />3.80 minutes <br />681.88 LCYRrour <br />2 scraper(s) <br />681.88 LCY/hour <br />1,3&3.7& <br />;, LCY/tfour <br />~ <br />10.59 Hours <br />$14,630 <br />/3 -/- g2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.