My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134363
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:11:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
12/7/2006
Doc Name
Public Scoping Report for the Environmental Impact Statement
From
BLM
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGENDA <br />RED CLIFF MINE EIS COOPERATING AGENCY MEETING <br />December 7, 2006: 1:00 pm to 4:00 pm <br />Meeting purpose: The purpose of this meeting is to provide an update to Cooperating <br />Agencies on the existing status and future schedule of the Red Cliff Mine EIS, and to <br />gather information from the Cooperators on specific items to be considered in the EIS <br />including: alternatives; cumulative impact area; and Corps of Engineers needs for the <br />EIS. <br />Attendees: BLM, URS, CAM, and Cooperating agencies (Mesa County, Garfield <br />County, Colorado Department of Natural Resources, U.S. Office of Surface Mining, U.S. <br />Army Corps of Engineers. <br />I. Progress Report and Project Schedule <br />-key dates <br />- data collection (including noise baseline measurements, Erioginum survey, <br />waters of the US jurisdictional determination, cultural, biological, traffic counts, <br />etc.) <br />- role of Cooperating Agencies <br />2. Scoping Report -summary of public comments submitted during the public scoping <br />comment period. <br />3. Alternatives proposed for consideration in the EIS. <br />Proposed Action <br />No Action alternative <br />Corps of Engineers -alternatives needed for 404 permit process <br />Other potential Alternatives <br />Alternative Screening Matrix <br />4. Cumulative Impact Area and Time <br />5. Questions or other items for discussion? <br />
The URL can be used to link to this page
Your browser does not support the video tag.