My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134318
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:01 PM
Creation date
11/26/2007 2:07:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
3/25/2003
Section_Exhibit Name
NH2 Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DMG <br />• Task # : 16 State :Colorado <br />Date : 01/20/2000 County: Montrose <br />User : HBR Site: New Horizon 2 <br />Permit or other job action : PR-05 <br />Task description :Haul topsoil from Mt. Nucla to T slot <br /> <br />sheet 1 of 2 <br />PermiUjob # : C-81-008 <br />Abbreviation :none <br />Filename: 0008-002 <br />HOURLY EQUIPMENT COST Shin basis: <br />Equipment Descri ption <br />Truck/loader team -Truck: Generic 12-18 cy, 6z4 <br />-Loader: CAT 9888 High Lift ( 1994) <br />Support equipment -Load area: CAT 1306 (1995) <br />-Dump area: NA <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />Cost Breakdown : Truck/LOatler Work Team Suppon Equipment <br />Truck Loading Tool Load Area Dump Area <br />Import data filename : truck2 loader grader NA <br />Utilization-machine: 99 100 100 NA <br />-Ripper attachment: NA NA NA NA <br />Ownership cost/hour: $12.71 $21.97 $7.40 NA <br />Operating cosVhour: $23.12 $50.88 $19.22 NA <br />Ripper Op. cosVhour : NA NA $0.00 NA <br />Operator costlllour: $21.70 $23.45 $23.27 NA <br />Unit subtotals : $57.53 $96.31 $49.89 NA <br />Number of units: 6 1 1 0 <br />Group subtotals: Work: $441.50 Support: $49.89 <br /> Total work team wstlhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 81,400 CCY factor: 1.215 volume: <br />Source of quantity take-off : na <br />Source of estimated swell factor: na <br />Matedal purchase cost: $0.00 /LCY Total cost: <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight: 2,550 pounds/LCY Struck volume: <br />Descr.: Earth -dry packed Heaped volume: <br />Rated payload: 48.800 pounds Average volume: <br />Payload capacity: 18.82 LCY Adjusted capacity: <br />Final adjusted Vuck capacity based on specific number of loader passes <br />Loading Tool Capacity <br />Rated capacity (nom. heapetl): 6.500 LCY <br />Descr.: Other -moist loam (100-110% ) <br />Bucket fill factor: 1.050 <br />Adjusted bucket capacity :6.825 LCV <br />2 per day <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />0 0 <br />Maintenance : $0.00 <br />$491.39 <br />98,901 LCY <br />$0 <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />15.00 LCY <br />13.65 LCY <br />Job Condition Corrections :Site altitude (h.) <br />Truck Loader <br />Altitude adj.: 1.000 1.000 <br />Job efficiency: - 0.810 0.810 <br />Net correction : 0.810 0.810 <br />5,700 <br />Source <br />(Cat HB) <br />(2shifts/day) <br />r~ I <br />~J <br />
The URL can be used to link to this page
Your browser does not support the video tag.