Laserfiche WebLink
COST ESTIMATE: TO LINE THIS SITE ON ITS PERIMETER WILL REQUIRE <br />333,700 CU. YDS. OF FILL. ASSUME $1.401 CU. YD. TO PLACE FILL THE <br />COST WILL BE $467,180. ASSUME THAT $20,000 WILL BE REQUIRED <br />FOR ADDITIVES THE TOTAL TO BOND WILL BE $487, 180. <br />~~ <br /> <br />~~~^'~_` - x ~ ~~y ~~-~~~~lilt=l ° <br />~,j~~ .-.~. ~r ~ ;>~~~i~~~ - 3~~ ~ (. -1111- 112 <br />3 ~ <br />1111=11111 ~ p <br />- =1111=f111=1111=1111 <br />1111=1111=1111,=1111=1111=! 1 <br />1111-1111-1111-FILL / LINER11-1111 INPLACE~ <br />_ 11111111=1111=1111=1111=111=1111=1111= RAVEL <br />_ =1111=1111=1111=1111=1111=1111=1111=1111=1111=1111 <br />_ a ~ o <br />1111=1111=1111=1111=1111=1111=1111=1111=1111=1111=1111 <br />=1111=111111111111=1111=1111=1111=1111=1111=III=1111=1111=1111 ~ <br />TYPICAL CLAY LINER SECTION <br />NCCI PIT NO. 1 <br />SCALE 1" = 10' <br />MATERIAL WILL BE ON SITE SHALE FROM THE BOTTOM OF THE PIT AND SOME OVERBURDEN IF REQUIRED. mIXTURE WILL BE <br />DETERMINED AFTER PIT IS OPEN AND MATERIALS CAN BE TESTED. <br />MATERIAL SHALL BE COMPACTED TO 95% PROCTOR DENSITY ASTM D698 <br />MATERIAL SHALL BE PLACE IN LIFTS NO THICKER THAN 3 FEET <br />MATERIAL SHALL MEET THE SPECIFICATION FOR GRADATION AS SHOWN ON PAGE 10 OF THE LINED PIT GUIDE AS <br />PROVIDED BY THE DIVISION OF MINERALS AND GEOLOGY <br />THE COEFFICIENT OF PERMEABILITY SHALL BE LESS THAN 1X10T0 THEE POWER CM/SEC <br />0 <br />M <br /> <br /> <br />ROLLIN CONSULTING <br />