My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134298
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:59 PM
Creation date
11/26/2007 2:06:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Permit File
Doc Date
2/21/2002
Doc Name
NCCU PIT 1 FN M-2001-107
From
RC ROLLIN CONSULTING
To
DMG
Section_Exhibit Name
EXHIBIT D & E & G
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RC ROLLIN CO~ULTTNG <br />970-454-0404 II <br />~~~~~~~~~~~~~~~~ • ECEIVED <br />sss <br />FEB 1 1 1001 <br />Division of Minerals end GeolopY <br />February 15, 2002 <br />Mr. Thomas A. Schreiner <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />Re: NCCI Pit #1, File No. M-2001-107 <br />Deaz Mr. Schreiner, <br />I have received your second adequacy review comments on the above captioned <br />Regulaz 112 Application and offer the following answers and explanations to the comments. <br />6.4.4 Exhibit D -Mining Plan <br />The revised reclamation cost estimate provided with our January 21, 2002 response provides <br />for the backfilling of 70, 184 cubic yard of overburden/ topsoil. In this reclamation plan we <br />will be using the overburden as topsoil and fill. The costs axe covered in items A - 33,882 <br />cu.yd., B - 19,360 cu.yd. and 4,840 cu.yd. and D - 12,102 cu.yd.. <br />6.4.5 Exhibit E -Reclamation Plan <br />Attached please Fmd a cross section of the proposed liner and a cost estimate for the <br />installation of this liner. We will be bonding 100% of the cost ttntil such time as the on site <br />materials from the bottom of the pit can be analyzed to determine the proper mixture of on <br />site materials and imported material so an informed plan can be submitted for the clay liner. <br />6.4.7 Exhibit G -Water Information <br />We have not secured an agreement with the owner of the dischazge ditch from Sand Hill <br />Reservoir so we will submit the agreement as a clarification to the permit when it is secured. <br />The plan and cross-section was provided on the revised mining plan in the January 21, 2002 <br />submittal. <br />840 EAGLE DRIVE, EATON, COLORAD0180615 <br />
The URL can be used to link to this page
Your browser does not support the video tag.