Laserfiche WebLink
_,~ ._ - <br />~~~ I~~I~~I~~II~~ I~~ • <br />RECLAMATION COST - Finq ~ <br />(1) edistribution of topsoil <br /> 30 ac x 5" 20,328 cy @ $1.SO1yd = $30,492.00 <br />(2) Fine grade Rit floor <br /> 23 ac @ $100.OOlac = $ 2,300.00 <br /> amine grade slopes <br /> 7 ar, @ $250.00/ac = $ 1,750.00 <br />(3) Drill & broadcast grass seed <br /> 30 ac @ $150.00 = $ 4,500.00 <br />(4) Maintenance of critical areas <br /> 10°h of slope area = .7 zc $ 991.00 <br />TOTAL Pc~ 30 AC'2ES Q"ooT=r',i^,roo <br />~rioy033.~0 <br />6 o a~r~ ~a~ l ~yq 5~Y <br />