My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134266
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:58 PM
Creation date
11/26/2007 2:04:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 70 REFUSE PILE EXPANSION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />6.7 Culvert Design for Haul Road Crossing at Sylvester Gulch ................................................................ 15 <br />6.8 Impacts to Wetland ..............................................................................................................................IS <br />~ 7.0 ROADS .......................................................................................................................................................... 15 <br />7.1 Haul Roads ........................................................................................................................................... 15 <br />8.0 MONITORING ....................................................................................:.........................................................16 <br />8.1 Quality Control ..................................................................................................................................... 16 <br />8.2 Groundwater, Leachate, and Water Quality Monitoring ..................................................................... 16 <br />8.3 Slope Stability ...................................................................................................................................... 16 <br />8.4 Compaction Testing ............................................................................................................................. 16 <br />9.0 RECLAMATiON ...................................................................................................... .....................................16 <br />9. I 1 ntroduction ...................................................................................................... ...................................16 <br />9.2 Topsoil/Subsoil Removal, Storage and Redistribution .................................... ....................................17 <br />9.3 Revegetation .................................................................................................... ....................................17 <br />9.4 Hydrologic Reclamation Plan .......................................................................... ...................................17 <br />9.5 Erosion Control ................................................................................................ ...................................17 <br />9.6 Miscellaneous Reclamation ............................................................................. ...................................18 <br />9.7 Estimate of the Cost of Reclamation ............................................................... ...................................18 <br />TABLES <br />1 Refuse Pile Expansion Materials Balance Estimated Quantities <br />2 Predicted Refuse Production <br />.3 3 Refuse Pile Expansion Life <br />4 RPE Leachate Production <br />5 Summary of Strength Parameter Data for RPE Slope Stability Analysis <br />6 Summary of Stability Analysis Results <br />7 Soil Strengths Regional Slope Stability Model <br />8 Highway 133 and Regional Slope Stability Analysis Results <br />9 Parameters Used For Estimating Runoff - SCS CN Method <br />10 RPE Runoff Estimate Results <br />1 I Summary of Estimated Total Runoff For Each Phase <br />12 Sediment Yields For RPE Phases <br />13 2H:1 V Side-Slope V-Notch Sediment Ditch Design Parameters <br />14 2H:1 V Side-Slope V-Notch Clear Water Diversion DitchBerm Design Parameters <br />] 5 Sediment Pond Capacity <br />APPENDICES <br />Intentionally left blank ..............................................................................................................................Appendix A <br />Phase Maps <br />Existing Topography <br />Existing Topography and Cross Section Locations -Figure B-1 .........................................Appendix B <br />Existing Cross Section -Figure B-2 ......................................................................................Appendix B <br />Harding Lawson Associates ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.