Laserfiche WebLink
<br />Table 4 <br />Reclamation Quantifies for Shaft #3 <br />Deeasification Bole and Electric Borehole <br />• Backfill dozer push = <br />• Guardrail = <br />• Concrete highway barriers at Shaft #3 (10') _ <br />• Trash Rack (3' x 3') _ <br />• (2) 30" CMP (CSLY-11 and CSLY-12) _ <br />• 42" CMP (CSLY-13) _ <br />• Concrete Headwalls for CMP's = <br />• Concrete Shaft #3 collar = <br />• Concrete Shaft #3 plug to install = <br />• Metal structure over Shaft #3 (12' x 12' x 6') _ <br />• <br />Temporary Shaft #3 Facilities <br />• Hoist Foundation <br />3'd @ 10' x 16' <br />• Winch Foundation <br />3'd@6'x6' <br />Permanent Shaft #3 Facilities <br />• Emergency Escape Capsule Facility <br />Concrete Foundation <br />3'c@6'x6' <br />casion - 2' dia. <br />20,630 c.y. <br />1,8001.f. <br />15 ea. <br />4 ea. <br />50 l.f. and 81 ft. <br />79 l.f. <br />8 c.y. <br />(or 216 s.f. @ 1" thick) <br />(122 s.f. x 2' deep) <br />12 c.y. <br />or 78 s.f. x 3' thick <br />864 c.f. <br />Exhibit 69 <br />I Mnv 1997 rLIR116. Revised Ocl. 1993 TR86 <br />