Laserfiche WebLink
1> <br />Table 3 <br />Sylvester Gulch Facilities <br />Quantities of Materials for Reclamation <br />Sylvester Gulch Main Access/Haul Road (Re-establish Light-Use Roadl <br />• Backfill dozer push (Station 58 to Station 92) <br />+ 2,300' x 30'w x 4' = 10,200 c.y. <br />+1,000' x 3O'w x 2' = 2,200 c.y. <br />10,400 c.y. <br />• Reclaim Road to Light-Use Road (backfill) (Station 7 to Station 58) <br />5,000' x 20' x 5' = 18,500 s.f. <br />• Excavate/Remove Stream Crossings, including Tensar geogrid & rock facing <br />2 x 20,000 c.y. = 40,000 c.y. <br />Plate Arch Culvert, 450'1 <br />• Guardrail (3') <br />• Re-Topsoil and Re-seed <br />• 4.6 acres <br />• Culvert <br />15" { 30" 130' <br />* Note: Geogrid type retained slope to remain in place. <br />Road culvert to remain for re-establish light-use road. <br />Substation Access Road <br />• Backfill dozer push <br />1,200'1 x 16'w x 6" = 4,200 c.y. <br />• Rip/Reclaim Road <br />1,200'1 x 24'w = 0.7 acre <br />• Culvert <br />15" Diameter CMP, 1501.f. <br />• Re-Topsoil and Re-seed <br />1.1 acres <br />• <br />Exhibit 69 1 ,Vov. /996 PR07R. Revised Ocl. 1998 TR86 <br />