Laserfiche WebLink
<br />• she of 4 <br />Calnradn Division of Minerals and 6eologv <br /> <br />RECLANATIOH COST SUMMARY FURN <br />----------------------------- <br />PERMIT NUMBER : N-77-546 PREP. BY: SSS FILENAME: N546-0 <br />DATE 14-Apr-95 OPERATION: Horvath Pit No. 1 <br />PERMIT ACTION : General 110(2) type per~it bond recalculation <br />GRAND TOTAL BOND AMOUNT 121,246 <br />I. DIRECT COSTS ====_==_=_-_ <br />A. EARTHWORK - BACKFILLIH6 i ROUGH 6RADINR <br />Task No.; Task Description ) Cost (11 <br />I I <br />1 . Replace and regrade 6' of topsoil/overburden 112,129 <br />on the 9.8 acre affected area. 94,664c.Y. <br />, <br />1 I <br />I I <br />I ~ <br />1 1 <br />I I <br />I <br />I 1 <br />1 1 <br />1 1 <br />1 I <br />I I <br />I I <br />1 I <br />I I <br />, <br />I <br />I , <br />, I <br />I 1 <br />I <br />I <br />1 I <br />I I <br />I <br />I I <br />I 1 <br />1 <br />1 1 <br />I 1 <br />1 1 <br />1 1 <br />~~~ rw~ ~~w~~n~ rwn ~~ ~~~~~ ~ r~~n ~~~».+~w~~~ww ~~r~~ ~~~~~ ~ ~w~nr~ ~n ~rs~• <br />Subtotal lAl: 112,129 <br />------------ <br />8. EARTHWORK - HIOHNALL REDUCTION <br />Task No.( Task Description ~ Cost (11 <br />1 1 <br />NA ; <br />I <br />I 1 <br />I 1 <br />I I <br />I I <br />I I <br />Subtotal (B): <br />C. EARTHWORK - NASTE PILE COVER PLACEMENT <br />Task Ho.. task Description <br />• I a <br />) NA <br />I <br />1 <br />i Cost (S) <br />1 <br />1 <br />r ~..~~~~~~nn~~~~~~~~~~ <br />Subtotal IC1: <br />_..~~ <br />