My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134219
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:55 PM
Creation date
11/26/2007 2:01:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
4/14/1995
Doc Name
HORVATH PIT 1 PN M-77-546 ENCLOSED BOND RECALCULATION
From
DMG
To
BRICE F AND PHYLLIS J LEE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />D02ER COST 6 PERFORMANCE DATA NORKSHEET cont'd <br />Node l: Cat D9L (1981) <br />ADJUSTED COST SUBTOTALS <br />-------------------- Ownership Costs <br />Dozer, ROPS 6 Attach~ent 52: <br />Single shifts 528.84 <br />Double shifts 521.63 <br />Triple shifts 519.23 <br />'HOURLY OPERATOR RAGES <br /> Base <br />Labor <br />------- Classification <br />----------------------- Rate <br />----------- <br />Dozer operator (l 10hp) SI3.60 <br />Dozer operator (>=70hp) 514.30 <br />Mechanic S14.c0 <br />i HOURLY EAUIPMENT COST SUMMARY <br />212.79 <br />55.39 <br />54.26 <br />-----~------------------- Overhaul d Operating Costs <br />Dozer 8 BOPS: <br />56.81 54.26 518.02 54.99 514.64 SlB.l9 <br />53.44 Attach~ent 52: <br />52.29 50.00 SD.00 50.00 50.00 50.00 <br />- -- - <br />sheet 2 of 2 sheets <br />54.46 50.00 52.06 <br />50.00 50.00 50.00 <br />Fringe F.I.C.A Une~pl. Nk.Co~p. Total ~ Shift <br />Benefits 7.101 6.202 12.SOZ (f/hr). Differential <br />53.50 51.05 50.84 51.70 520.69 ~ Day 50.00 ~ 2 shift/day avg.: 50.15 <br />53.50 51.10 50.89 51.79 521.58 I Swing: 50.30 ~ 3 shift/day avg.: 50.25 <br />53.50 <br />----------- 51.12 <br />----------- 50.91 <br />-------- 51.83 <br />------- 521.95 ~ <br />--------- Night: 50.45 <br />------------------------------------------ <br /> Ownership ~ Operating 5 Overhaul Costs ~ Operator ~ Total <br /> Costs ~ Doter Ripper ~ Costs ~ Cost/HR (S) <br />Single shifts 548.49 566.62 50.00 221.58 5136. 69 <br />Double shifts : 531.46 266.62 50.00 521.13 5119. 80 <br />Triple shifts 525.78 566.62 50.00 521.83 5114. 22 <br />-------------------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------------------- <br />EAUIPMENT PERFORMANCE DATA <br />- - - EAUIPMENT SPECIFICATIONS - - - <br />Description <br />--------------- <br />NACHINE MAKE 6 MODEL: Cat D9L 11987) <br />D01ER BLADE: Universal <br />ATTACHMENT S1: ROPS Cab <br />ATTACHMENT t2: N/A <br />Horsepower Trans. Weight Length Nidth Height Fuel Ripper <br />(FHP) Type (tons) If t.) Ift.) (ft.l Type Type <br />460 Poxershift 48.9 22.9 10.4 13.8 diesel N/A <br />N/A N/A 9.6 N/A 16.3 6.5 N/A N/A <br />N/A NJA N/A N/A N/A N/A N/A N/A <br />NJA H/A N/A N/A N/A <br />- ---- N/A <br />------- N/A <br />-- N/A <br />---------- <br /> Total Nt.: 58.4 tons <br />
The URL can be used to link to this page
Your browser does not support the video tag.