My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134209
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:54 PM
Creation date
11/26/2007 2:01:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999098
IBM Index Class Name
Permit File
Doc Date
3/28/2000
Doc Name
CONSIDERATION OF BOARDS DECISION TO APPROVE A 112C PERMIT APPLICATION OVER OBJECTIONS RIVERVIEW RESO
From
DMG
To
CAMAS COLO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BEFORE THE MINED LAND RECLAMATION BOARD <br />STATE OF COLORADO <br />FINDINGS OF FACT, CONCLUSIONS OF LAW, AND ORDER <br />IN THE MATTER OF CAMAS, INC., RIVERVIEW RESOURCES SITE, FILE NO. <br />M-1999-098, APPROVAL OF A 112 PERMIT APPLICATION OVER OBJECTIONS <br />THIS MATTER having come before the Mined Land Reclamation Board ("the Boazd") on March 22, <br />2000 for a hearing, the Board makes the following Findings of Fact and Conclusions of Law, and <br />enters the following Order: <br />FINDINGS OF FACT AND CONCLUSIONS OF LAW <br />1. On October 12, 1999, CAMAS filed a 112 Permit Application, File No. M-1999-098, <br />fora 340 acre surface sand and gravel mining operation in Weld County, Colorado, Secs. 32 and 35, <br />T6N, R66W, 6th P.M. <br />2. Timely objections to the application were received by the Division of Minerals and <br />Geology ("Division"). As a result, the Division held an informal conference pursuant to Construction <br />Materials Rule 1.4.6(I)(b) on January 7, 2000. ' <br />3. The matter was scheduled for the March 22, 2000 Board Hearing. <br />4. On Mazch 6, 2000, the Division issued a recommendation to the Board to approve the <br />permit application with one condition, that the setback from all critical structures be maintained at 200' <br />unless the Applicant submitted an acceptable slope stability analysis by 4p.m. March 9. On the same <br />day, the Division mailed its approval recommendation and recommendation rationale to the parties, <br />addressing the objections and concerns raised during the public comment period and informal <br />conference phases. <br />5. On Mazch 14, 2000, aPre-hearing Conference was held in Greeley, Colorado, to verify <br />the list of parties and to narrow and distill the issues to be considered by the Board at the final hearing. <br />Ms. Sandra Brown presided as the Pre-hearing Conference Officer designated by the Boazd. As a <br />result of the Pre-hearing Conference, aPre-hearing Order was generated, listing the parties and <br />outlining the schedule and time allotments for presentations at the final hearing. Two parties, Families <br />for Responsible Aggregate Mining (FRAM), and the City of Greeley, submitted written notifications <br />of their withdrawing as parties from this matter. FRAM included the following objectors: <br />Joe and Helen Lohnes <br />13804 Weld County Road #64 <br />Greeley, CO 80631-9331 <br />
The URL can be used to link to this page
Your browser does not support the video tag.