Laserfiche WebLink
• construction activities for a diversion ditch on the southern border of the permit area, and does not <br />affect the actual stream channel. The request for a variance is founded on Peabody's (now WFC's) <br />commitment to protect the hydrologic balance by minimizing and mitigating the disturbance using <br />the engineering design and mining and reclamation plans referenced on the above pages in <br />Peabody Tab 16. Toward this end, WFC will stake the buffer zone and disturbance limits along <br />Calamity Draw to assure adherence to the approved limits of disturbance. <br />Any range or coal fires will be controlled or suppressed, and their prevention will be encouraged <br />to the extent possible. Excluded are those fires approved by the CDMG as part of a management <br />plan. <br />The majority of traffic will be in the active pit, spoil, and facilities areas. Other roads will be light <br />duty roads with a minimal impact to wildlife. The replaced east-west county road will be replaced <br />to its present location with the right-of-way fenced after the road is reopened. <br />• <br />• (REVISED 4-18-96) 2.05.6(2) - 5 <br />