Laserfiche WebLink
iiiniiiiii <br /> RECEIVED SAP 1 3 35 <br /> Communications <br /> H.D.Howlett 11 th Floor-Operations <br /> Manager- Right of Way 1875 Lawrence Street <br /> P.O. Box 5020 <br /> Denver,CO 80217 E + D <br /> September 12, 1985 <br /> SEP 17 05 <br /> MINED LAND <br /> Heidi Hirsh RECLAMATION DIVISION <br /> Rindahl & Associates <br /> 2305 S. Syracuse Way, Suite 217 <br /> DPrrver, Colorado 80231 <br /> Dear Heidi: <br /> We do not object to the proposed mining operations by Varra <br /> Companies, Inc. as we understand them. The following items, <br /> while not all inclusive are some of the means we use to <br /> protect our buried plant. We ask you and your client to <br /> please give tam careful consideration. <br /> 1. Roads crossing the AT&T easement should <br /> cross at right angles or as close to 90 <br /> degrees as reasonably possible. <br /> 2. Road crossings should be engineered and <br /> constructed in a manner to prevent damage <br /> to the buried facility (our outside plant <br /> agineer should be consulted as to the <br /> protective measures required an all types <br /> of crossings - roads, culverts etc.) <br /> 3. The easement of right of way should be kept <br /> free of structures, equipment, material and <br /> stockpiles. <br />