Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TR-47 BONDING SCHEDULE <br />This schedule calculates the change in bonding due to the reduction in cover requirement <br />for reclamation of the Development Waste Pile. The total cover was reduced from four feet <br />to two feet, as allowed by Rule 4.10.4(5). Inert material was reduced from 3.25 feet to 1.25 feet, <br />a reduction of 61.5%. The topsoil requirement was unchanged. <br />Current Bonding Requirement (from COST SUMMARY FORM Exhibit 28-2): <br />Direct Costs: <br />Task No. Task Description Task Hours Direct Cost <br />012 -Haul Topsoil from Entrance stockpile to DWP <br />13a -Haul and spread 30,097 cy cover material from RDA to DWP <br />13b -Rip material for 3.5' cover on 5.33 ac. DWP <br />TOTAL <br />Indirect Costs: <br />Liability Insurance at 1.55% of Direct Cost <br />Performance Bond @ 1.05% of Direct Cost <br />Job Superintendent @ $33.50 per hr. x 50% of Task Hours <br />Profit @ 10% of Direct <br />Total Overhead & Profit <br />TOTAL CONTRACT (Direct + Indirect Cost Totals): <br />Project Management @ 9.25% of Contract <br />TOTAL BOND FOR DWP (Tasked related to TR-47): <br /> <br />Revised Bonding Requirement (Due to TR-47); <br />Direct Costs: <br />Task No. Task Description <br />012 -Haul Topsoil from Entrance stockpile to DWP <br />13a -Haul and spread 11,587 cy cover material from RDA to DWP <br />13b -Rip material for 1.25' cover on 5.33 ac. DWP <br />TOTAL DIRECT <br />Indirect Costs: <br />Liability Insurance at 1.55% of Direct Cost <br />Performance Bond @ 1.05% of Direct Cost <br />Job Superintendent @ $33.50 per hr. x 50% of Task Hours <br />Profit @ 10% of Direct <br />Total Overhead & Profit <br />TOTAL CONTRACT (Direct + Indirect Cost Totals): <br />Project Management @ 9.25% of Contract <br />TOTAL BOND FOR DWP (Tasked related to TR-47): <br />CALCULATED CHANGE IN BOND ($45,398-105,754) <br />• <br />TR-47 <br />EX 28-72 <br />10.14 6,039 <br />79.24 59,395 <br />30.41 18,752 <br />119.79 84,186 <br />1,305 <br />884 <br />2,006 <br />8,419 <br />12,614 <br />96, 800 <br />8, 954 <br />105,754 <br />Task Hours Direct Cost <br />10.14 6,039 <br />30.51 22,867 <br />11.71 7,220 <br />52.36 36,126 <br />560 <br />379 <br />877 <br />3,613 <br />5,429 <br />41,554 <br />3, 844 <br />45,398 <br />$ (60,358) <br />(Revised 3/24/03) <br />