Laserfiche WebLink
• <br />• <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :Colorado Division O(Minerals And Geology <br />sheet 1 of 2 <br />Task # : 011 State :Colorado Permit/ob # : C-81-012 <br />Date : 0&iCV2001 County :Las Animas Abbreviation :none <br />User: JHB Site:New Elk Mine Filename:C012-017 <br />Permit or other job action :2001 Midtemr <br />Task description :Haul and spread topsoil material to RDA <br />HOURLY EQUIPMENT COST <br />Equipment Description Shift basis : 7 per day <br />Truck loader team -Truck : Generic 12-18 cy, 6x4 <br />-Loader : CAT 966F S.2 std. lift (1999) <br />Support equipment -Load area : Cat D8R - 8SU <br />-Dump area : Cat D8R - 8SU <br />Road maintenance -Motor grader : NA <br />-Water Vuck : Water Tanker, 5,000 Gal. <br />Cost Br <br />iakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment I, <br />Motor Grader Water Truck ~'~~ <br />~ <br />Import data filename : truck2 loader dozer dozer NA I <br />misctruk <br />°h Utilization-machine : 90 100 100 100 NA 25 I <br />-Ripper attachment : NA NA NA NA NA NA I <br />Ownership wsVhour: 320.12 $30.78 $43.04 543.04 NA $24.42 <br />Operating cosVhour: $24.07 830.74 $65.98 365.98 NA 810.50 <br />Ripper op. cosVhour: NA NA $0.00 $0.00 NA NA I <br />Operator cosUhour: $23.61 327.99 $27.99 $2799 NA 523.61 <br />Unit subtotals : $67.80 389.51 $137.02 $137.02 NA $58.52 <br />Number o(units : 3 1 1 1 0 1 <br />Group subtotals : Work : $292.91 Support : 3274.03 Maintenance : $58.52 <br />Total work team cosVhour : $625.46 <br /> <br />Initial Swell Loose <br />volume: 33,710 CCY factor: 1.725 volume: 37,924 LCY <br />Source of quantity take-oH :Permit table 24, Map 24 i <br />Source of estimated swell factor : Caterpillar Handbook, 28th edih~on <br />Material purchase cost : $0.00 /LCY Total cost : $0 , <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weigfit : 2,650 poundslLCY Stnck volume : 12.00 LCY <br />Descr.: Decomposed rock - 25% rock, 75% earth Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.11 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specifc number of loader passes : 14.85 LCY <br />Loadlng Tool Capacity : ob Condition Corrections : Site altitude (ft.) : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCY Truck Loader Source <br />Descr.:Other - rocWdirt mixtures (100.120% J Altitude adj.: 1.000 1.000 (Caf Ht <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (f shiNAlt <br />Adjusted bucket capacity : 4.950 LCY Net correction : 0.830 0.870 <br />Exle ZS-57 <br />~evrao~l ~laz <br />