My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lJ <br />CIRCES Cost Estimating Software <br />TRUCKlLOADER TEAM WORK <br />sheet 1 of 2 <br />Agency or organization name :Colorado Division OI Minerals And Geology i <br />Task # : 035 State :Colorado PenniUjob # : C-81-012 <br />Date: 08/082001 County :Les Animas Abbreviation :none , <br />User : JHB Slte :New Elk Mine Filename : C012-035 <br />Permit or other job action :2001 Midterm <br />Task description :Haul 8 spread 4, 698 cu.yd. topsoil from borrow area to East Portal <br />1 per day <br />-Loader:CA7966F <br />t -Load area :Cat D8R - <br />-Dump area :Cat D8R - <br />-Water truck <br />• <br />`I <br />Cost Breakdown : Truck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment i <br />Motor Grader Water Truck, <br />Import data filename : truck2 loader dozer dozer NA misctruk I <br />Utilization-machine : 91 100 100 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA '~ <br />Ownership cost/hour: 520.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosUhour: $24.19 $30.74 $65.98 $65.98 NA $2.49 <br />Ripper op. cost/hour: NA NA 50.00 $0.00 NA NA <br />Operator cosUhour: $23.61 $27.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $67.92 $89.51 5137.02 5137.02 NA $33.74 '. <br />Number of units : 5 1 1 1 0 1 ' <br />Group subtotals : Work : $429. f0 Support : $274.03 Maintenance : 533.74 ~ <br />Total work team cosUhour : $736.87 <br />Initial Swell Loose <br />volume: 4,698 GCY factor: 1.125 volume: 5,285 LCY <br />I <br />Source of quantity take-oH: Maps 15 8 16 j <br />Source of estimated swell factor :Caterpillar Handbook 28th edition j <br />Material purchase cost : $0.00 /LCY Total cost : $0 , <br />Truck Capacity <br />Truck Payload (weight) Basis <br />Truck Bed (volume) Basis <br />Material weight : 2,550 poundslLCY Struck volume : 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume . 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted tru ck capacity based on specific number of loader passes : 14.85 LCY <br />Loading Tool Capacity : ob Condition Corrections : Site altitude (tt.) : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCY Truck I Loader Source <br />Descr.:Other - rock/dirt mixtures (100.12095) Altitude adj.: 1.000 1. D00 (Cat HE <br />Adjusted bucket capacity : 4.950 LCY <br />Exk <br />Net correction : 0.830 0.830 <br />ZA ~ 52, <br />Revrse~ Y/iz- <br />
The URL can be used to link to this page
Your browser does not support the video tag.