• <br />• <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Permit or other job action :2001 Midterm <br />Task description:Haul9,951 t <br />HOURLY EQUIPMENT COST <br />sheet 1 of 2 <br />Cost Breakdown : TrucWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment i <br />Motor Grader Water Truck: <br />Import data filename : truck2 loader dozer dozer NA misctruk i <br />Utilization-machine : 100 100 100 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosHhour: $20.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosUhour: 526.72 $30.74 $65.98 $65.98 NA $2.49 <br />Ripper op. cosUhour : NA NA $0.00 $0.00 NA NA <br />Operator cosUhour: 523.67 $27.99 $27.99 $27.99 NA $23.61 ' <br />Unit subtotals : $70.45 $89.51 $137.02 $137.02 NA $33.74 ~ <br />Number of units: 2 1 1 1 0 1 j <br />Group subtotals : Work : $230.41 Support : $274.03 Maintenance : $33.74 <br />Total work team cosVhour : 5538.78 <br />Initial Swell Loose <br />volume: 9,951 CCY factor: 1.125 volume: 11,195 LCY <br />Source of quantity take-off :Maps 15, 11, Pages 2.05.21, stockpile calculations <br />Source of estimated swell factor :Caterpillar Handbook, 28th edition <br />Material purchase wst : $0.00 /LCY Total cost <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: EaRh -dry packed Heaped volume : 18.00 LCV <br />Rated payload : 48,000 pounds Average volume : 75.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 14.85 LCY <br />Loading Tool Capacity : ob Condition Corrections : Site altitude (ft.) : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCY Truck Loader Source <br />• <br />Descr.: Other - rocWdirt mixtures (i00-120%) Altitude adj.: 1.000 1.000 (Cat Hf <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shi/t/dt <br />Adjusted bucket capacity : 4.950 LCY Net correction : 0.830 0.830 <br />~xk z~-Sb Reyrs~ y/o z <br />Agency or organization name :Colorado Division Of Minerals And Geology ~ <br />Task # : 034 State :Colorado PermiVjob # : C-81-012 ! <br />Date: 08/082001 County :Las Animas Abbreviation :none <br />User : JHB Site :New Elk Mine Filename : C012-034 <br />