My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 j <br />Agency or organization name :Colorado Division O(Minerals And Geo/ogy <br />Task # : 033 State :Colorado Permitfob # : CC-81-012 I <br />Date : 0 8/0 82 0 0 1 County :Las Animas Abbreviation :none <br />User : JHB Site :New Elk Mine Filename : C012-033 I <br />Permit or other job action :2001 Midterm <br />Task descdption :Haul & spread 5227 cu.yd. topsoil borrow mat. yo 6.48 acres j <br /> <br />HOURLY EQUIPMENT COST Shift basis : 1 per day 1 <br />Equipment Description <br />Truck loader team -Truck :Generic 12-18 cy, 6x4 <br />-Loader :CAT 966F S.2 std. lilt 1 <br />Support equipment -Load area : Ca108R - BSU <br />-Dump area :Cal D8R - 85U <br />ad maintenance -Motor grader :NA <br />-Water truck :Water Tanker, 2, 500 G <br />• <br />Cost Breakdown : Truck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader ~ Water Truck I <br />Import data filename : lruck2 loader dozer dozer NA misctruk I <br />%Utilization-machine: 100 100 100 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cost/hour. $20.12 $30.78 $43.04 $43.04 NA $7.65 ' <br />~ <br />Operating cosUhour : $26.72 $30.74 $65.98 $65.98 NA $2.49 <br />! <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA I <br />Operator cosUhour : $23.61 527.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals: $70.45 $89.51 $137.02 $137.02 NA $33.74 <br />Number of units : 2 1 1 1 0 1 <br />Group subtotals : Work : $230.41 Support : $274.03 Maintenance : $33.74 I <br />Total work team cost/hour : 5538.18 <br />Initial Swell Loose j <br />volume: 5,227 BCY factor: 1.250 volume: <br />__ 6,534 LCY 1 <br />~ <br />Source of quantity take-off :Permit page 2.05-22 <br />Source of estimated swell factor : Caterpi!!ar Handbook, 28th edition j <br />Material purchase cost $0.00 /LCY Total cost SO i <br /> <br />r ~ ~, <br />tZk.t.~ <br />a. ~ .-v=mss ~ <br />~ ~ z~ <br />, ; <br />HOURLY PRODUCTION <br />~ <br />Truck Capacity : ~ <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume : 18.00 LCY { <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY ~ <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on spe cific number of loader passes : 14-85 LCY <br /> <br />Loading Tool Capacity : <br />ob Condition Corrections : <br />Site altitude (R.) : ii <br />7,400 <br />Rated capacity (nom. heapetl) : 4.500 LCY Truck Loader Source <br />• <br />Descr.:Other- rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) I <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shiR/day) '~ <br />Adjusted bucket capacity : 4.950 LCY Net correGion : 0.830 0.870 ~, <br />~ 1, z8- ~~8 ~Qevl'st~ Ylvz- <br />
The URL can be used to link to this page
Your browser does not support the video tag.