My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br /> Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 13a State :Colorado Pennitlob # : C-81 <br />Dale: 08/07/2007 County :Las Animas Abbreviation :none <br />User: JHB Site :New Elk Mine Filename:C012 <br />-012 <br />Permit or other job action :2001 Midterm <br />Task description :Haul and spread 330,097 BCY cover material from RDA to DWp <br />i per day <br />• <br />acre <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck I <br />Import data filename : truck2 loader dozer dozer NA misctruk <br />Utilization-machine : 100 100 100 100 NA 25 ~ <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosUhour : 520.12 $30.78 $43.04 $43.04 NA $765 <br />Operating cosVhour: $26.72 $30.74 $65.98 565.98 NA $2.49 <br />Ripper op. cesUhour : NA NA $0.00 $0.00 NA NA <br />Operator cosUhour: $23.61 $27.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $70.45 $89.51 $137.02 $137.02 NA $33.74 <br />Number of units : 5 1 1 1 0 f I <br />Group subtotals : Work : $441.76 Support : $274.03 Maintenance : $33.74 <br />Total work team cosVhour : 5749.54 <br />Initial Swell Loose ' <br />volume: 30,097 8CY factor: 1.250 volume: 37,621 LCY ~ <br />I <br />Source of quantity take-off :Map 15, KAG est. <br />Source of estimated swell factor : Caterpillar Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 , <br />Truek Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY ~ Struck volume : 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 14.85 LCY <br />Loadlng Tool Caoaeitv <br />• Rated capacity (nom. heaped) : 4.500 LCY <br />Descr.:Ofher - rock/dirt mixtures (100-120% J <br />Bucket fill factor : 1.100 <br />Adjusted bucket capacity : 4.950 LCY <br /> Truck <br /> Altitude adj.: 1.000 <br /> Job efficiency : 0.830 <br /> Net correction : 0.830 <br />Site altitude (R.) : 7,400 <br />Loader ~oura <br />0.830 <br />~xk z8 - zG Revts~ ~l z <br />
The URL can be used to link to this page
Your browser does not support the video tag.