My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 012 State :Colorado Pertnitlob # : C-81 <br />Date : 0 8/0 72 0 0 1 County :Las Animas Abbreviation :none <br />User : JHB Site :New E/k Mine Filename : C012 <br />Permit or other job action :2001 Midterm <br />Task description :Haul topsoil /rom entrence stockpile to DWP (5.33 acres) <br />HOURLY EQUIPMENT COST Shift basis : 1 per day I <br />Equipment Description <br />-Loader :CAT 965E S.2 std. tiff (1999) 'i <br />Support equipment -load area :Cat D8R - 8SU <br />-Dump area :Cat 08R - 8SU '~, <br />-Water truck <br />• <br />Cost Breakdown : Truck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck I <br />Import data filename : truck2 loader dozer dozer NA misctrvk ~ <br />Utilization-machine : 84 100 100 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $20.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosVhour : $22.37 $30.74 $65.98 $65.98 NA $2.49 ~ <br />Ripper op. cosUhour: NA NA $0.00 $0.00 NA NA <br />Operator cosVhour : $23.61 $27.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $66.10 $89.51 $137.02 $137.02 NA $33.74 <br />Number of units : 3 1 1 1 0 1 <br />Group subtotals : Work : $287.80 Support : $274.03 Maintenance : $33.74 i <br />Total work team cosUhour : $595.57 <br />Initial Swell Loose <br />volume: 4,300 CCY factor : 1.125 volume: 4,838 LCY <br />Source of quantity take-oH :Area digitized )rom Map 15 <br />Source of estimated swell factor:Caterpillar Handbook <br />Matedal purchase cost : $0.00 /LCY Total cost : $0 <br />-pit ~ ',tom' .i'~ .+ -.t .4 4 .~ ,}^1 kpy <br />HOURLY PRODUCTION <br />Truek Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2, 550 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 14.85 LCY <br />Loading Tool Capacity : ob Condltlon Corrections : Site altitude (R.) : 7,400 <br />• Rated capacity (nom. heaped) : 4.500 LCY Truck Loader Source <br />Descr.:Other - rocWdirt mixtures (f 00.120%) Altitude adj.: 1.000 1.000 (Cat HE <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : 4.950 LCY Net correction : 0.83D 0.830 <br />sheet 1 of 2 ~ <br />~xl, za-Z'1 Re~,o~ yy°z <br />
The URL can be used to link to this page
Your browser does not support the video tag.