My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br /> CIRCES Cost Estimatlnd Software <br />• TRUCK/LOADER TEAM WORK <br /> <br /> <br />PROJECT IDENTIFICATION ... <br />,. , . <br />Agency or organization name :Colorado Division O1 Minerals And Geology <br />Task # : 10d Slate :Colorado Permit/job # : C-81-01Y <br />Date : 03x21/2002 _ County :Las Animas Abbreviation :none <br />User : JHB Slle :New Elk Mme Filename : C012-10d <br />Permit or other job action :2001 Midterm <br />Task description :haul clean coal stockpl/e footprint to Devel. waste pile <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck : Generic 12-18 cy, 6x4 <br />-Loader : CA7 968E S.2 sttl. IiR (15 <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area :Cat D8R - 85U <br />Road maintenance -Motor grader : NA <br />-Water truck :Water Tanker, 2,500 Gal. <br />• <br />Cost Breakdown : ruck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename : truck2 loader dozer dozer NA misctruk <br />°/ Utilization-machine : 100 100 100 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour : $20.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosUhour: $26.72 $30.74 $65.98 $65.98 NA $2.49 <br />Ripper op. cosVhour : NA NA $0.00 $0.00 NA NA <br />Operator cosVhour: $23.61 $27.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $70.45 $89.51 $137.02 $137.02 NA $33.74 <br />Number of units : 3 1 7 1 0 1 <br />Group subtotals : Work : $300.86 Support : $274.03 Maintenance : $33.74 <br />Total work team cosVhour : $608.64 <br />:.:.... <br />MATERIAL QUANTITIES <br />Initial ~ Swell Loose <br />volume: 7,550 CCY factor: 1.035 volume: 7,814 LCY <br />Source of quantity take-oH :Permit Map 13- 1 R. thick <br />Source of estimated swell factor :Caterpillar Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck CaoaclN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 1.600 pounds/LCY Struck volume :_ 12.00 LCY <br />Descr.:Coal-bituminous, raw Heaped volume: 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 30.00 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on spe cific number of loader passes : 14.85 LCY <br />Loatllna Tool CaaaclN : b Condition Corrections : Site altitude (R.) : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCY Truck Loader Source <br />. <br />Descr.:Other- rocWdirt mixtu2s (100-120%) Altitude adj.: 1.000 1.000 (Cat HBJ <br />Bucket fill factor : 1,100 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : 4.950 LCY Net correction : 0.830 0.830 <br />Fx.(t is -~z r Revrs ~~ Y/o z- <br />
The URL can be used to link to this page
Your browser does not support the video tag.