Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br />• TRUCK/LOADER TEAM WORK <br /> <br />PROJECT IDENTIFICATION ,: ; <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Task # : 10a State :Colorado PenniUjob # : C-81-012 <br />Date : OA/07l2001 County :Las Animas Abbreviation :none <br />User: JHB Site :New Elk Mine Filename:C012-10a <br />• <br />l I <br />Permit or other job action :200[ Midterm <br />Task description :Haul SE coal stockpile footprint to Bevel. waste pile <br />..: <br />HOURLY EQUIPMENT COST Shift basis : 7 per day <br />Equipment Descdption <br />Tmck/loader team -Truck : Genedc 12-18 cy, 6x4 _ <br />-Loader :CAT 966E S.2 sttl. lilt (1999) <br />Support equipment -Load area :Cat: Cat D8R - 8SU _ <br />-Dump area :Cat D8R - 85U <br />Road maintenance -Motor g2der : A <br />-Water truck :Wafer Tanker, 2,500 Gal. <br />Total work team cosUhour : $597.65 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 7,212 CCY factor: 1.185 volume: 8,546 LCY <br />Cost Breakdown : ruck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA miscfnrk <br />%Utilization-machine: 86 100 tOD 100 NA 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour : 820.12 $30.78 $43.04 $43.04 NA $7.65 <br />Operating cosUhour: $23.06 $30.74 $65.98 $65.98 NA 82.49 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost hour: $23.67 $27.99 $27.99 $27.99 NA $23.61 <br />Unit subtotals : $66.79 $89.51 8137.02 $137.02 NA $33.74 <br />Number of units : 3 1 1 1 0 7 <br />Group subtotals : Work : $289.88 Support : $274.03 Maintenance : $33.74 <br />Source of quantity take-off :Permit Map 13- 2 h. thick <br />Source of estimated swell factor :Caterpillar Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />.. . <br />HOURLY PRODUCTION <br />Truck CaoaciN <br />Truck Payload (weight) Basis : Truck Beo (volume) Basis <br />Material weight: 1,600 pounds/LCY Struck volume: 12.00 LCY <br />Descr.:Coal-bituminous, raw Heaped volume: 18.00 LCY <br />Rated payload : 48.000 pounds Average volume : 15.00 LCY <br />Payload capacity : 30.00 LCY Adjusted capacity: 15.00 LCY <br />Final adjusted truck capacity Dosed on specific number of loader passes : 14.85 LCY <br />Loading Tool CaoaciN : ob Condition Corrections : Site altitude (ft.} : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCY I Truck I Loader ~ource <br />Descr.:Other- rocWdirt mixtures (f00-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1. f00 Job efficiency : 0.830 0.830 (7 snauday) <br />Adjusted bucket capacity : 4.950 LCY Ne[ correction : 0.830 0.830 <br /> ~xk z~- ~ ~~:~ y~oz <br />