Laserfiche WebLink
May 16 07 01:05p Greg Lewicki and Associal 3033466934 <br />Initial Reclamation Liability Estimate Response White River Ciry Pit <br />Page 2 of 2 Permit No. tit-2006.064 <br />reclamation scenario the acreage that would require replacement of topsoil has been <br />calculated to be ]2.7 acres. To replace 15" oftopsoil over 12.7 acres using a swell <br />factor of 1.125 would require 28,814 cubic yards. Utilizing your cost of <br />$0.778/LCY, the total cost to replace topsoil over 12.7 acres can be calculated to be <br />$22,417. <br />Under Indirect Costs, you agreed to reduce the cost of the Job Superintendent by <br />50% since dewatering of the pit will not require full-time supervision. <br />Based on the above information we request that you recalculate the initial reclamation <br />liability. Should you have any other questions or concerns, please feel free to call me. I <br />can be reached at (720) 842-5321. I look forwazd to hearing from you soon. <br />Sincerely, <br />Richazd M. Wenzel III, P.E. <br />Greg Lewicki and Associates <br />Encl: Map C-2 (pdf file) <br />Highwall Reclamation Slope Figure <br />p.3 <br />cc: Ben Connell, Connell Resources, Inc. <br />File <br />