My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134082
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:46 PM
Creation date
11/26/2007 1:53:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
8/16/2004
Section_Exhibit Name
2.05 Operation and Reclamation Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 APPLIQ,TI@i FOR PERNIIT F0~2 SURE~CE O~2 UDIDII2GR0UNID MIl1IIdG ACTIVITIES -- <br />MINIM[IM REQUIRFS~PlPS F'OI2 OPF~tATION AND RDCLAt~,TION PLANS. <br />• 2.05.6 Mitigation of Surface Coal Mining Operation 7nq~acts. (Cont'd.) <br />(6) (f) (iii) (C) <br />Subsidence is not predicted to alter the reasonable foreseeable use of <br />structures (refer to Section 2.05.6 (6) (e)) and purchase of structures <br />is not required. <br />(6) (f) (iii) (D) <br />Economically and technologically feasible means are available (refer <br />to Subsidence Repair Handbook, Volume 3) to prevent material damage, <br />and noncancelable insurance policies payable to surface owners is not <br />required. <br />(6) (f) (iv) <br />A detailed description of COVCC's subsidence monitoring program is <br />presented in Section 2.05.6 (6) (c) (i). This monitoring program will <br />determine the degree of material damage or diminution of value or <br />reasonable foreseeable use of the surface (refer also to Section 2.05.6 <br />(3) (b) (iii) . <br />(6) (f) (iv) (A & B) <br />• During the initial permit term, undermining of structures and other <br />features which might be materially damaged by subsidence will not <br />occur. However, during subsequent permit terms, pre-mining structure <br />surveys will occur at the owners request prior to undermining and will <br />typically be completed on an annual basis until the Division agrees <br />that the subsidence monitoring within the concerned area is adequate. <br />A permanent location or benchmark will be emplaced at each structure. <br />The station will be monitored in conjunction with the subsidence <br />monitoring stations and will be completed using standard survey <br />techniques and equipment. Information gathered will include accurate <br />horizontal and vertical locations, and general interior-exterior <br />inspections, where ownership permission <br />_~ <br />PR 93-03 Revised 04/17/93 <br />163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.