Laserfiche WebLink
<br /> <br />EBHIBIT L <br />HALLETT MATERIALS COMPANY <br />WINKLER LIGHT AGGREGATE QUARRY <br />DOUGLAS COUNTY, COLORADO <br />MAJOR DISTURBANCE RECLAMATION COSTS <br />UNIT <br />N0. ITEM UNIT QTY. PRICE TOTAL PRICE <br />1. Backfill Overburden C.Y. 70,180 S 1.00 S 70,180.00 <br />2. Redistribute Topsoil C.Y. 11,697 $ 1.00 S 11,697.00 <br />3. Redistribute Excess <br />Overburden C.Y. 73,003 S 1.00 S 73,003.00 <br />3. Scarify Compacted Areas Acre 4.0 5725.00 $ 2,900.00 <br />4. Seed, Fertilize, Nulch Acre 33.0 S500.00 S 16,500.00 <br />5. Mobilization and <br />Demobilization L.S. 2 S500.00 S 1,600.00 <br /> TOTAL $175,880.00 <br />Descriptions: <br />Backfill Overburden <br />Crushed Stone <br />Cut Stone <br />Redistribute Topsoil <br />Crushed Stone <br />Cut Stone <br />Scarify Compacted Areas <br />Seed, Fertilize, Mulch <br />20.0 Acres x 1B" Depth <br />9.0 Acres x 18" Depth <br />20.0 Acres x 3" Depth <br />9.0 Acres x 3" Depth <br />1.0 Acre Topsoil Stockpiles <br />3.0 Acres Overburden Stockpiles <br />16.0 Acres Mined <br />13.0 Acres Stripped <br />1.0 Acre Topsoil Stockpiles <br />3.0 Acres Overburden Stockpiles <br />Note: Quarry edges will be blasted at a 3:1 slope. <br />L-2 <br />