Laserfiche WebLink
<br />Rio Tinto Energy America Page 1 of 1 <br />Colowyo Mine <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />September 14, 2006 <br />ADDENDUM TO 180-DAY REPORT <br />NOTICE OF INTENT NUMBER CX-2006-109-12 <br />2. Describe reclamations activities <br />As of this date, all activities related to this NOI and its amendments are complete. No further <br />activity related to this NOI is anticipated. <br />Drilling activity occurred on a total of 42 drill sites. The drill sites were located south and west <br />of the West Pit (22 drill sites) and in the Collom project azea (21 drill sites). The Collom project <br />area is approximately four (4) miles west of the current Colowyo mining area. The drill sites are <br />shown on the accompanying map. <br />LOWER WILSON (LW) AND SOUTH TAYLOR (ST) DRILL SITES <br />Only five (5) of the eleven Lower Wilson `LW-06' drill sites were completed. Theses sites are <br />located southwest and west of the active West Pit. The drill sites not drilled were -02, -03, -04, - <br />O5, -06, and -09. <br />For the South Taylor `ST-06' drill sites, only ST-06-18 was not drilled. The drill sites are all <br />located southwest and south of the active West Pit. <br />The respective drill and/or core holes on the drill sites have been sealed and/or plugged using the <br />method described in the NOI. No further activity is planned for these sites. <br />No monitoring wells or piezometers were completed on any LW-06 drill site. One monitoring <br />well and one piezometer were installed on ST-06-04 and ST-06-17, respectively. All notification <br />of intent to drill and the monitoring hole completion reports have been filed with the Division of <br />Water Resources -State Engineers Office. <br />As of this date, all drill sites have been reclaimed and topsoil replaced. The sites are proposed to <br />be reseeded in September 2006. <br />COLLOM (C) DRILL SITES <br />In the Collom project area, only 21 of the proposed 44 `C-06' drill sites had activity. Drill sites <br />C-06-O1 through -O5, -07, -12, -13, -18 -24, -27 through -33, and -39 through -44 were not <br />completed and will not be completed. All drill and/or core holes on the 21 drill sites have been <br />sealed and/or plugged using the method described in the NOI. No further activity is planned for <br />these sites. <br />One piezometer each was completed on the C-06-21 and C-06-26 drill sites. All notification of <br />intent to drill and the monitoring hole completion reports have been filed with the Division of <br />Water Resources -State Engineers Office for these piezometers. <br />As of this date, all drill sites have been reclaimed and topsoil replaced. The sites aze proposed to <br />be reseeded in September 2006. <br />N:\CCC_ENG\LOM\GBOMODEL\Geomd12006\DMG\AddendumFinal l 80dayrptfoN6.doc <br />