Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task # : 06a State :Colorado <br />Date : 11/30/2005 County :Montrose <br />User : GRM Site : J Birds Mine <br />Permit or other job action :Final Reclamation Initial Estimate -2005 <br />Task description :Initial Mobilization to site <br />sheet 1 of 2 <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, SOT, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $23.32 $25.78 $31.45 <br /> Operating cosUhour : $30.29 $31.74 $35.14 <br /> OperatorcosUhour. $27.40 $27.40 $2740 <br /> HelpercosUhour: $0.00 $25.15 $25.15 <br /> Total Unit CosUhour : $81.01 $110.07 $119.13 <br />runu_aneneni F FflI11PMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />CosUfleet <br />-Cat D6R LGP - 6S 28.39 $27.20 $110.07 1 $137.27 $110.07 $0.00 <br />-reveg equipment 10.00 $10.00 $81.01 1 $91.01 $81.01 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : . $228.28 $191.08 $0.00 <br />PermiUjob # :M-2005-050 <br />Abbreviation :none <br />Filename : M050-O6a <br />