<br />Enfield Pit Mining Area <br />Enfield pit (E-pit), located on the eastern boundary of the Derringer pit mining area and at the divide of No <br />Name and Johnson Gulch watersheds, will remain idle (temporarily abandoned) during the 1998-2002 <br />permit term. It will remain open to be used as a future ash disposal site. Final reclamation in Enfield Pit <br />will occur when its ash disposal capacity is used up (in approximately 2014). See Section 3.5.5 for a <br />description of temporary abandonment. <br />Flintlock Pit Mining Area <br />After walking from Ashmore South pit in September 1997, the Baby Doe dragline opened a boxcut in <br />Flintlock pit (F-pit). Located in the headwaters of the East Pyeatt drainage, mining in F-pit will advance to <br />the east for the duration of the 1998-2002 permit term. Refer to the M10 series maps for a yearly detail of <br />the mining and reclamation sequences for the 1998-2002 permit term. <br />FlinBock East Mining Area <br />Mining in the Flintlock East pit (F-East pit) is scheduled to begin in early 2002 when the Molly Brown <br />dragline completes stripping in Derringer pit and walks to this area. The F-East pit mining area is a <br />continuation of Ashmore South pit. However, two seams, the L-seam and M-seam, will be mined in <br />addition to the I-seam. Mining will advance to the east, from the East Pyeatt watershed to the Oak <br />drainage area, for the remainder of the 1998-2002 permit term. Refer to the M10 series maps for a yearly <br />detail of fhe mining and reclamation sequence for the 1998-2002 permit term <br />Getting Pit Mining Area <br />• The Galling pit (G-pit) is located in the southeastern region of the permit area at the headwaters of the <br />Flume Gulch and Deal Gulch watersheds. The initial overburden removal in G-pit will be accomplished <br />with scrapers. Upon completion of mining in Ashmore East pit in early 2002, the Queen Anne dragline will <br />move north to complete the boxcut started by the scrapers on the eastern mining limit of G-pit. Mining will <br />then advance to the west for the remainder of the 1998-2002 permit term. Refer to the M10 series maps <br />for a yearly detail of the mining and reclamation sequences for the 1998-2002 permit term. <br />Hawken Pit Mining Area <br />Mining in Hawken pit (H-pit) was wmpleted in April 1997. After performing reclamation activities, the <br />Queen Anne dragline walked to Ashmore pit in May 1997. Refer to the M10 series maps for a yearly <br />detail of the mining and reclamation sequences for the 1998-2002 permit term. <br />Ithaca Scraoer Pit Mining Area <br />There is no mining scheduled for Ithaca pit (I-pit) during the 1998-2002 permit term. This area was <br />originally projected to affect previously disturbed and reclaimed but unmined land. It was to be located on <br />the northern fringes of the old Ashmore pit located in the Coyote watershed. <br />3.1.5 ReGamation Plan <br />Following mining, pits are backfilled as a part of the overburden and interburden removal operation. As <br />the dragline excavates a pit, the overburdenlinterburden material is spoi{ed (backfilled) into the previous <br />pit. The backfill material is placed in piles that require additional contouring. Contouring is accomplished <br />• with dozers, graders and similar equipment. Occasionally, the dragline is also used. The backfilled pit is <br />graded to approximate the pre-mined contour and blended in with the surrounding topography. Final <br />grading is performed along the contour except where the safety of men and equipment may be <br />compromised. <br />3 15a Revisio^: T~ 69 <br />App~ov~: 11 fr/ f o l <br />