Laserfiche WebLink
<br />f. Provide an estimate of actual costs to reclaim the site based on what it would cost the State <br />using an independent contractor to complete reclamation, plus administrative costs. <br />RECLAMATION COSTS <br />Estimated cost per item: <br />1. Grass seed mix 69.43/A 9.999 A $ 692.71 <br />2. Drilling grass seed 22.00/A 9.999 A 219.97 <br />3. Fertilizer (40#/A N&P) 29.23/A 9.999 A 292.27 <br />4. Fertilizer application 17.50/A 9.999 A 174.98 <br />5. Topsoiling w/dozer or loader <br /> Maximum push 250', 4"/A avg. 0.75/cy 5,377cy 4,032.75 <br />6. Replacing Overburden -0- -0- -0- <br />7. Scazifying (disk or chisel) 52.50/A 9.999 A 524.94 <br />8. Weed Control 25.00/A 9.999 A 249.97 <br />9. 4,000#/A grass, hay or straw <br /> Mulch 170.00/A 9.999 A 1,699.83 <br />10. Spread & crimp mulch 55.00/A 9.999 A 549.94 <br />11. I3acksloping (done with mining) -0- -0- -0- <br />12. Mobilization Cost (Lump sum) 600.00 600.00 <br />$ 9,034.06 <br />Indirect Cost 18.5% 1,671.30 <br />Administration Expense 5.0% 535.27 <br />$ 11,240.63 <br />Rounded to: $11,240.00 <br />