Laserfiche WebLink
sheet 1 of 2 <br /> <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Q5q State :Colorado PermiUjob # : C-82-057 <br />06/28!2004 <br />JRS <br />Permit or otherjob action :Permit Revision 04 <br />Task description :Replace Topsoil from Stockpile to Haul Road I <br />... .................. <br />,::. ,: <br />HOURLY EQUIPMENT COS7 <br />Shift basis : 1 perday <br />• Cost Bre <br />Equipment Description <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer :NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer SuppoR Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape/1 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />OwnerhipcosUhour: $75.83 NA NA NA $34.64 $60.62 <br />Operatingcost/hour: $165.89 NA NA NA $10.65 $23.49 <br />Ripper op.cosUhour: NA NA NA NA $0.00 NA <br />Operator cosUhour : $25.43 NA NA NA $24.92 $20.88 <br />Unit subtotals : $267.15 NA NA NA $70.21 $104.99 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,068.62 Support : $0.00 Maintenance : $175.20 <br />Total work team cost/hour : $1,243.81 <br />County : Routt <br />Site :Seneca li-W Mine <br />Abbreviation :none <br />Filename : C057-054 <br />