My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133807
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:30 PM
Creation date
11/26/2007 1:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• ~~ <br /> PROJECT IDENTIFICATION <br /> Task # : 043 <br /> Date : 06/28/2004 <br /> User : JRS <br />State ;Colorado <br />County : Routt <br />Site :Seneca li-W Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :Permit Revision 04 <br />Task description :Regrade Pond 017 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R- 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />OwnershipcosUhour : $51,07 NA <br />OperatingcosUhour : $93,97 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost hour : $31,83 NA <br />Total unit cosUhour : $178.87 Total.fleet wst/hour <br />Shift basis : 1 per day <br />Data source : (CRG) <br />• MATERIAL QUANTITIES ~~ ~ ~~ <br />Initial Swell Loose <br />volume : 7,100 CCY factor : 1.125 volume : 7,988 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 25% Rock, <br />0.00 % (pos) <br />7,500 feet <br />2,650 Ibs/LCY <br />75% Eadh <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />$176.87 <br />(lshift/day) <br />1.00 ~ (S/SI <br />0.39 <br />272.20 LCY/hr <br />272,20 LCY/hr <br />• JOB TIME AND COST ~~ ~~~ ~~ ~~~ ~~~ <br />Fleet size : 1 Dozers) Total job time : 29.34 Hours <br />Unit cost : $0.650 /LCY Total job cost : $5,190 <br />PermiUjob# : C-82-057 <br />Abbreviation :none <br />Filename : C057--043 <br />Horsepower: 405 <br />
The URL can be used to link to this page
Your browser does not support the video tag.