My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133807
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:30 PM
Creation date
11/26/2007 1:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 29-Jun-2004 Permit orjob no.: C-82-057 Site :Seneca li-W Mine <br />User : JRS Abbreviation : none State :Colorado <br />Task : OOa Filename : C057-0Oa County : Routt <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit orjob action :Permit Revision 04 <br />Task description :Highwall Reduction and Backfilling Tasks -Tasks 001-004 and 007-016 <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Drill and ShootA Pit Highwall blasting 1 41.7 $10,934 <br />002 -Drill and Shoot South Wadge Pit Highwall blasting 1 302.31 $79,120 <br />003 -Drill and Shoot Sage Creek/Wol/Creek Pit Highwall blasting 1 49.9 $12,934 <br />004 -Drill and Shoot Sage Creek Pit Highwall blasting 1 44.7 $11,703 <br /> <br /> <br />007 -Doze A Pit Highwall -Partially Backfill Pit dozer 4 8.81 $11,734 <br />008 -Doze Adjacent A Pit Spoil Ridges dozer 4 99.8 $132,908 <br />009 -Doze South Wadge Pit Highwall -Partially Backfill Pit dozer 4 63.4 $84,443 <br />010 -Doze Adjacent South Wadge Pit Spoil Ridges dozer 4 1,318.9 $1,755,929 <br />011 -Doze Sage Creek/Wolf Creek Pit Highwall -Partially Backfill Pit dozer 4 10.5 $14,069 <br />012 -Doze Adjacent Sage Creek/Wol/Creek Pit Spoil Ridges dozer 4 111.9 $149,049 <br />. 013 -Doze South Sage Creek Pit Highwall -Partially Backfill Pit dozer 4 8.6 $11,470 <br />014 -Doze Adjacent South Sage Creek Pit Spoil Ridges dozer 4 111.9 $149,049 <br />015 -Haul Facilities Area Surface Material to Pit scraped 4 33.1 $41,198 <br />016 -Dispose of Coal Stockpiles to Pit scraped 4 10.5 $13,082 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• <br /> <br /> <br />SUBTOTALS : 2,216.5 $2,477,622 <br />
The URL can be used to link to this page
Your browser does not support the video tag.