My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133807
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:30 PM
Creation date
11/26/2007 1:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• <br /> PROJECT IDENTIFICATION <br /> Task # : 010 <br /> Date : 06/28/2004 <br /> User : JRS <br />State :Colorado <br />County : Routt <br />Site :Seneca li-W Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Revision 04 <br />Task description :Doze Adjacent South Wadt <br />HOURLY EQUIPMENT COST <br />Pit <br />Basic machine :CatO11R-11U Horsepower: 850 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost hour : $112.02 NA <br />Operating cosUhour : $188.97 100 <br />Ripper op. cosuhour : $0.00 0 <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $332.82 Total fleet cosUhour : $1,331.29 <br />• MATERIAL QUANT171ES <br />Initial <br />volume : 5.500.000 <br />Swell Loose <br />LCY factor: NA volume: 5,500,000 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :NA <br />;: <br />HOURLY PRODUCTION , <br />Job Condition Corredlon Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,284.9 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday) <br />Loose stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 0.93 (Cat Ht3) <br />Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.82 <br />Weight description <br />Sandstone Adjusted unit production : 1042.48 LCY/hr <br /> Adjusted fleet production : 4,169.92 LCY/hr <br />• JOB TIME AND COST <br />Fleef size : 4 Dozers) Total job time : 1318.97 Hours <br />Unit cost : $0.319 /LCY Total job cost : $1, 755,929 <br />Permiujob# : C-82-057 <br />Abbreviation :none <br />Filename : C057--010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.