My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133807
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:30 PM
Creation date
11/26/2007 1:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• PROJECT IDENTIFICATION <br />Task # : 008 <br />Date : 06/28/2004 <br />User : JRS <br />State :Colorado <br />County : Routt <br />Site :Seneca li-W Mine <br />PermiUjob# : C-82-057 <br />Abbreviation :none <br />Filename : C057-008 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Revrsron 04 <br />Task description :Doze Adjacent A Pit Spoil ~ <br /> HOURLY EQUIPMENT COST <br /> Basic machine :Cat D11R - 11 U Horsepower : 850 <br /> Blade type :Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosVhour : $112.02 NA <br /> Operating cosUhour : $188.97 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $31.83 NA <br /> Total unit cosVhour : $332.82 Total fleet cosUhour : $1,331.29 <br />• MATERIAL QUANTITIES ~~ ~ ~~ <br /> Initial Swell Loose <br /> volume : 416,300 LCY factor : NA volume : 416,300 LCY <br /> <br /> Source of estimated volume :Division Estimate <br /> Source of estimated swell factor :NA <br /> HOURLY PRODUCTION ~ ~~ Job Condition Correction Factors ~~ ~~~ Source ~~~ <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 250 feet Material consistency : 1.20 (Cat HB) <br /> Unadjusted hourly production : 1,264.9 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (lshift/day) <br /> Loose stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.33 (Cat HB) <br /> Average push gradient : 15.00 % (neg) Altitude : 0.93 (Cat HB) <br /> Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,550 Ibs/LCY Net correction : 0.82 <br /> Weight description <br /> Sandstone Adjusted unit production : 1042.48 LCY/hr <br /> Adjusted fleet production : 4,169.92 LCY/hr <br />• JOB TIME AND COST <br /> Fleet size : 4 Dozers) Total job time . 99.83 Hours <br /> Unit cost : $0.319 /LCY Total job cost : $132,908 <br />
The URL can be used to link to this page
Your browser does not support the video tag.