My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133807
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:30 PM
Creation date
11/26/2007 1:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task # : 003 <br />BLASTING MATERIALS QUANTITIES <br />• Total quantity of stemming required <br />Total quantity of explosives required <br />Total quantity of det. cordHuse/wire required <br />Quantity of blasting caps used per blasthole <br />Total quantity of <br />of orimers used Der blasthole <br />Total quantity of primer <br />Quantity of delays used <br />Total quantity of delays <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />QUANTITY <br />25.16 <br />3, 801 <br />3, 854 <br />1 <br />85 <br />1 <br />85 <br />1 <br />sheet 2 of 2 <br />UNIT <br />feet <br />Data source : (CRG data) <br />Drilling equipment- Drilt :REEDRILL SK451, 9.0 in, <br />- Drill pad preparation :NA <br />Misc. drilling support equipment : A <br />Misc. explosives support equipment :NA <br />Explosives delivery/prep. -Bulk truck : NA <br />-Cap truck : NA <br />• <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : drilling NA NA NA NA NA <br />Utilization -machine+att. no. 1 : 100 NA NA NA NA NA <br />-ripper or attachment no. 2 : 100 NA NA NA NA NA <br />Equipment ownership $/hr : $82.64 NA NA NA NA NA <br />Machine+att. 1 operating $/hr : $118.34 NA NA NA NA NA <br />Ripper or att. 2 operating $/hr : $2.88 NA NA NA NA NA <br />Operator+additionallabor$/hr: $51.09 NA NA NA NA NA <br />Unit subtotals : $259.99 $0.00 $0.00 $0.00 $0.00 $D.00 <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : $254.94 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Total work team cosUhour : $254.94 <br />MATERIALS COST ;::: .... ... ::. ...:. ... ..,. ,:. . ,. .. :.. <br /> Description Unit Unit Cost Quantity Total Cost <br />Blastingagent: BulkANFOnom.density pound $0.174 3,801.39 $661.44 <br />Primers or boosters : Cast primer 0.31b each $2.092 85.00 $177.82 <br />Blasting caps : on-electric cap, inst. each $2.792 85.00 $237.32 <br />Det. cord, fuse or wire : etonating cord, 10 grAt. linearfoot $0.086 3,854.40 $331.48 <br />Delays : S connectors each $3.558 86.00 $305.99 <br />Miscellaneous : Stemming, 1.5 in. gravel cu. yd. $20.50 17.62 $361.15 <br />Drill bits • : bit life = 1,750.0 linearleet $2,155.00 0.97 $2, 093.43 <br />' bit lice unit =linear foot, bit wst unit =each (per bit) Total materials cost : $4,168.62 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br />Job Condition Correction Factors - Site altitude : 8,000 feet <br /> Altitude adjustment : 0.90 (DMG est.) <br />Total drilling length : 1,700 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 82.00 feeUhour Adjusted drilling rate : 49.45 feet/hour <br />• Dulling time . 34.38 hours Explosrves prep. trme 15 6f hours <br />JOB TIME AND COST Total job time : 49.99 hours <br />Total unit cost : $1.956 per cu. yd. Total job cost : $12,934 <br />
The URL can be used to link to this page
Your browser does not support the video tag.