Laserfiche WebLink
Task # : 002 <br />BLASTING MATERIALS QUANTITIES <br />• Total quantity of stemming required <br />Total quantity of explosives required <br />Total quantity of det. cord/fuse/wire regt <br />QUANTITY <br />152.16 <br />sheet 2 of 2 <br />UNIT <br />Quantity of blasting caps used per blasthole 1 cap(s) <br />Total quantity of blasting caps required 514 caps <br />Quantity of primers used per blasthole 1 rimers) <br />Total quantity of primers required 514 rimers <br />Quantity of delays used per blasthole 1 delay(s) <br />Total ouantiri of delays required 51.5 alavc <br />HOURLY EQUIPMENT COST <br />Shift basis ; 1 per day <br />Data source : (CRG data) <br />Drilling equipment -Drill :REEDR/LL SK451, 9.0 in. <br />_ -Drill pad preparation :NA <br />Misc. drilling support equipment :NA <br />Misc. explosives support equipment :NA <br />Explosives delivery/prep. -Bulk truck :NA <br />-Cap truck :NA <br />• <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl, <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : drilling NA NA NA NA NA <br />Utilization -machine+att. no. 1 : 100 NA NA NA NA NA <br />-ripper or attachment no. 2 : 100 NA NA NA NA NA <br />Equipment ownership $/hr : $82.84 NA NA NA NA NA <br />Machine+att. 1 operating $/hr : $118.34 NA NA NA NA NA <br />Ripper or att. 2 operating $/hr : $2.88 NA NA NA NA NA <br />Operator+additional labor $!hr : $51.09 NA NA NA NA NA <br />Unit subtotals : $254.94 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : $254.94 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Total work team cosUhour : $254.94 <br />MATERIALS COST _..._ <br /> Description Unit Unit Cost Quantity Total Cost <br />Biastingagent: u1kANFOnom.density pound $0.174 22,98722 $3,999.78 <br />Primers or boosters : Cast primer, 0.316 each $2.092 519,00 $1,075.29 <br />Blasting caps : Non-electric cap, inst. each $2.792 514.00 $1,435.09 <br />Det. cord, fuse or wire : Detonating cord, 10 gr./R, linear foot $0.086 23,202.30 $1,995.40 <br />Delays: MSconnectors each $3.558 515.00 $1,832.37 <br />Miscellaneous : Stemming, 1.5 in. gravel cu. yd. $20.50 152.16 $3,119.32 <br />Drill bits' : bit life = 1,750.0 linearfeet $2,155.00 5.87 $12,659.09 <br />L <br />on lire unit = unear root, brt cost unit =each (per bit) Total materials cost : $26,116.33 <br />DRILLING AND EXPLOSIVES PREPARATION TIME ~ ~ ~~ ~~~ <br />Job Condition Correction Factors - Site altitude : 8,000 feet <br /> Altitude adjustment : 0.90 (DMG est.) <br />Total drilling length : 10,280 linear feet Job efficiency factor : 0.67 (Ch. Exc. HBJ <br />Unadjusted drilling rate : 82.00 feeUhour Adjusted drilling rate : 49.45 feeUhour <br />Drilling time : 207.90 _ hours Explosives prep. time : 94.40 hours <br />JOB TIME AND COST Total job time : 302.31 hours <br />Total unit cost : $1.979 per cu. yd. Total job cost : $79,120 <br />