Laserfiche WebLink
Figure 1-3 <br />QUARTERLY INSPECTION REPORT <br />OPERATOR: <br />iNE: <br />~TE OF INSPECTION: <br />POND IDENTIFICATION <br />TYPE OF POND <br />OPERATIONAL STATUS AT TIME OF INSPECTION <br />Approximate Water Level: <br />Sediment Level (X total storage): <br />Outflow (cfs): <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br />Rills & Gullies on Embankment _ _ <br />Inadequate Vegetation <br />~utlet Channel Erosion _ _ <br />urrows _ _ <br />Other _ _ <br />STRUCTURAL: <br />Differential Settling _ _ <br />Cracks or Slides _ _ <br />Seepage _ _ <br />Other <br />APPURTENANT STRUCTURES: <br />Defective Spillways _ <br />Dewatering Device Clogged _ _ <br />Faulty Gates, Baffles, Pumps _ _ <br />Other <br />ADDITIONAL COMMENTS: <br />.INTENANCE REQUIRED: <br />NAME OF INSPECTOR: <br />-13- <br />